Search

Your search keyword '"Kanban"' showing total 134 results

Search Constraints

Start Over You searched for: Descriptor "Kanban" Remove constraint Descriptor: "Kanban" Publisher elsevier bv Remove constraint Publisher: elsevier bv
134 results on '"Kanban"'

Search Results

1. Optimalisation of Internal Logistics Transport Time Through Warehouse Management: Case Study

2. Lean manufacturing and Industry 4.0 combinative application: Practices and perceived benefits

3. Autonomous, low-cost sensor module for fill level measurement for a self-learning electronic Kanban system

4. Lean and agile manufacturing for work-in-process (WIP) control

5. Discrete event-driven model predictive control for real-time work-in-process optimization in serial production systems

6. A framework for lean manufacturing implementation in Indian textile industry

7. Evaluation of Continuous Improvement Techniques using Hybrid MCDM Technique under Fuzzy Environment

8. Introducing traceability in the Indian Surimi supply chain

9. Intelligent self-designing production control strategy: Dynamic allocation hybrid pull-type mechanism applicable to closed-loop supply chains

10. Experimental analysis of alternative production flow controls for high variety product manufacturing

11. A practical Framework for the Optimization of Production Management Processes

12. Intelligent Material Supply Supporting Assistive Systems for Manual Working Stations

13. A hybrid fuzzy-neural-based dynamic scheduling method for part feeding of mixed-model assembly lines

14. Lot splitting under load-limiting order release in high-variety shops: An assessment by simulation

15. Development and evaluation of a Basestock-CONWIP pull production control strategy in balanced assembly systems

16. Kanban in software engineering: A systematic mapping study

17. Cloud Kanban Framework for Service Operations Management

18. Kanban for Lean Production in High Mix, Low Volume Environments

19. Sequential SWARA and fuzzy VIKOR methods in elimination of waste and creation of lean construction processes

20. Industry 4.0 and the current status as well as future prospects on logistics

21. State-of-the-art Approaches to Material Transportation, Handling and Warehousing

22. Adaptive card-based production control policies

23. Life Cycle and Supply Chain Management for Sustainable Bins

24. Implementing lean construction techniques and management methods in Chinese projects: A case study in Suzhou, China

25. Performance evaluation of WIP-controlled line production systems with constant processing times

26. Dynamic Manufacturing Cells and SME Network: Key Success Factors

27. Simulation-based analysis of catalyzers and trade-offs in Lean & Green manufacturing

28. Single-stage Kanban system with deterioration failures and condition-based preventive maintenance

29. Evaluation of multi-product lean manufacturing systems with setup and erratic demand

30. Effect of product mix on multi-product pull control

31. A case study: SMED & JIT methodologies to develop continuous flow of stamped parts into AC disconnect assembly line in Schneider Electric Tlaxcala Plant

32. Effective Material Handling System for JIT Automotive Production Line

33. Lean Automation enabled by Industry 4.0 Technologies

34. Lean Production in the Era of Industry 4.0

35. Information and decision-making delays in MRP, KANBAN, and CONWIP

36. Lean Leadership – 15 Rules for a Sustainable Lean Implementation

37. A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques

38. Optimal control of a production-inventory system with productreturns

39. A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach

40. Adaptive lead time quotation in a pull production system with lead time responsive demand

41. Alternative refilling policies for an assembly line managed by kanbans

42. Goal-question-Kanban: Applying Lean Concepts to Coordinate Multi-level Systems Engineering in Large Enterprises

43. Production Lead Time Problem: Formulation and Solution for Bernoulli Serial Lines

44. Global Value Chains in East Asia

45. Using the Lean Six Sigma (DMAIC Framework) for Risk Elimination of Medication Errors at Kemang Medical Care

46. A study on the risk management of multi Kanban system in a closed loop supply chain

47. The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities

48. An integrated MOGA approach to determine the Pareto-optimal kanban number and size for a JIT system

49. Model Development of a Virtual Learning Environment to Enhance Lean Education

50. Variations of the kanban system: Literature review and classification

Catalog

Books, media, physical & digital resources