Back to Search
Start Over
A study on the risk management of multi Kanban system in a closed loop supply chain
- Source :
- International Journal of Production Economics. 139:65-68
- Publication Year :
- 2012
- Publisher :
- Elsevier BV, 2012.
-
Abstract
- We present a pull system that uses a new approach to facilitate material control and scheduling in a disassembly environment and is called the multi Kanban system for disassembly (MKSD). Within the MKSD is an approach to optimize operation and mitigate supply chain risk factors as well. We also compare the performance of MKSD to its “push” counterpart. Various scenarios are explored using a case example. For the scenarios, the assumptions, input data and results are presented. The study clearly demonstrates the effectiveness of the multi Kanban system over the push system.
- Subjects :
- Supply chain risk management
Economics and Econometrics
business.industry
Computer science
Supply chain
Control (management)
Scheduling (production processes)
Kanban
Management Science and Operations Research
General Business, Management and Accounting
Industrial and Manufacturing Engineering
Reliability engineering
Operations management
business
Closed loop
Risk management
Subjects
Details
- ISSN :
- 09255273
- Volume :
- 139
- Database :
- OpenAIRE
- Journal :
- International Journal of Production Economics
- Accession number :
- edsair.doi...........efa7740fd96e20881038f0d26a4b8208