Speedy switchover of operation from Tobata No. 1 to No. 4 blast furnace at Yawata Works*

Authors :
Kurita, Y.
Morizane, Y.
Noguchi, S.
Kurihara, K.
Ogata, I.
Terada, Y.
Kurita, Y.
Morizane, Y.
Noguchi, S.
Kurihara, K.
Ogata, I.
Terada, Y.
Source :
Revue de Métallurgie; July 2000, Vol. 97 Issue: 7 p887-896, 10p
Publication Year :
2000

Abstract

Nippon Steel Yawata Works operates with only one blast furnace in service. BF No. 1 (inner volume : 4407 m3) was blown off on January 31, 1998 after operating for thirteen years. The third campaign of BF No. 4 (inner volume : 4250 m3) was started the following day and productivity reached 2.0 t/d.m3IV after fifteen days of operation. This paper describes the characteristics of the relining of No. 4 furnace. Also presented is the background of the speedy switchover of large blast furnace operation and the rapid increase in productivity without any reduction in output.

Details

Language :
English
ISSN :
00351563 and 11563141
Volume :
97
Issue :
7
Database :
Supplemental Index
Journal :
Revue de Métallurgie
Publication Type :
Periodical
Accession number :
ejs53471438
Full Text :
https://doi.org/10.1051/metal/200097070887