Speedy switchover of operation from Tobata No. 1 to No. 4 blast furnace at Yawata Works*
- Source :
- Revue de Métallurgie; July 2000, Vol. 97 Issue: 7 p887-896, 10p
- Publication Year :
- 2000
-
Abstract
- Nippon Steel Yawata Works operates with only one blast furnace in service. BF No. 1 (inner volume : 4407 m3) was blown off on January 31, 1998 after operating for thirteen years. The third campaign of BF No. 4 (inner volume : 4250 m3) was started the following day and productivity reached 2.0 t/d.m3IV after fifteen days of operation. This paper describes the characteristics of the relining of No. 4 furnace. Also presented is the background of the speedy switchover of large blast furnace operation and the rapid increase in productivity without any reduction in output.
Details
- Language :
- English
- ISSN :
- 00351563 and 11563141
- Volume :
- 97
- Issue :
- 7
- Database :
- Supplemental Index
- Journal :
- Revue de Métallurgie
- Publication Type :
- Periodical
- Accession number :
- ejs53471438
- Full Text :
- https://doi.org/10.1051/metal/200097070887