Cite
Speedy switchover of operation from Tobata No. 1 to No. 4 blast furnace at Yawata Works*
MLA
Kurita, Y., et al. “Speedy Switchover of Operation from Tobata No. 1 to No. 4 Blast Furnace at Yawata Works*.” Revue de Métallurgie, vol. 97, no. 7, July 2000, pp. 887–96. EBSCOhost, https://doi.org/10.1051/metal/200097070887.
APA
Kurita, Y., Morizane, Y., Noguchi, S., Kurihara, K., Ogata, I., Terada, Y., Kurita, Y., Morizane, Y., Noguchi, S., Kurihara, K., Ogata, I., & Terada, Y. (2000). Speedy switchover of operation from Tobata No. 1 to No. 4 blast furnace at Yawata Works*. Revue de Métallurgie, 97(7), 887–896. https://doi.org/10.1051/metal/200097070887
Chicago
Kurita, Y., Y. Morizane, S. Noguchi, K. Kurihara, I. Ogata, Y. Terada, Y. Kurita, et al. 2000. “Speedy Switchover of Operation from Tobata No. 1 to No. 4 Blast Furnace at Yawata Works*.” Revue de Métallurgie 97 (7): 887–96. doi:10.1051/metal/200097070887.