27 results on '"Riesgo de inundaciones"'
Search Results
2. Perspectives of Southwest Florida Homeowners and Real Estate Agents before Hurricane Ian.
- Author
-
Palm, Risa and Bolsen, Toby
- Subjects
- *
REAL estate agents , *FLOOD risk , *FLOOD damage , *HURRICANES , *COUNTRY homes , *HOME prices - Abstract
In September 2022, Hurricane Ian made landfall in southwest Florida, causing an estimated $67 billion in damage and the loss of almost 150 lives. Before this date, demand and house prices in this area were rising faster than anywhere else in the country. What did homeowners in southwest Florida believe about flood risk to their own homes, and what did real estate agents believe about the role of flood risk in the residential housing market? The survey research summarized in this article shows that not only did residents feel that they were not particularly at risk from flooding, but also that damaging floods would not affect future home values in their neighborhoods or for their own homes. We found that political party affiliation was strongly correlated with the direction and strength of these beliefs. Real estate agents also reported strong demand for low-elevation coastal housing, noting that coastal lifestyle outweighed the prospect of flooding in residential decision-making. They also observed that the detailed maps of flood risk that are now available at realtor.com for anyone browsing for houses for sale had no effect on homebuyers, and that most of their customers were generally unconcerned with flood risk. [ABSTRACT FROM AUTHOR]
- Published
- 2023
- Full Text
- View/download PDF
3. Estudio hidrológico-hidráulico y de diagnosis de una red de drenaje urbano
- Author
-
Díez, Maitane, Berzosa, Iker, Díez, Maitane, and Berzosa, Iker
- Abstract
El presente estudio tiene como objetivo la solución de los problemas existentes de la red de saneamiento Irún y Hondarribia, realizando un modelo matemático hidrológico e hidráulico. Para este estudio se ha utilizado el software InfoWorks ICM (Innovyze by Autodesk), con el cual se obtiene un modelo calibrado con el que conocer el estado actual de la red, determinando el volumen y la afección de vertidos contaminantes, así como los problemas de diseño de la propia red que provocan afecciones, como elevados estados en carga en los interceptores principales de llegada a las estaciones bombeo e inundaciones superficiales en el núcleo urbano. De este modo se han definido diferentes escenarios, analizando tanto el estado actual, como el estado futuro con las proyecciones de cambio climático generadas para la zona de estudio, y a partir de los datos extraídos en este análisis, dar solución a los problemas encontrados.
- Published
- 2024
4. A new model to analyze urban flood risk. Case study: Veracruz, Mexico.
- Author
-
Zúñiga, Emmanuel, Novelo Casanova, David A., Domínguez, Christian, García Benítez, Marcelino, and Piña, Violeta
- Subjects
- *
URBAN land use , *CLIMATE change models , *FLOOD risk , *FLOOD warning systems , *AUTOREGRESSIVE models , *BODIES of water , *PEARSON correlation (Statistics) - Abstract
Due to their frequency and magnitude, urban floods affect different regions of the world. For this reason, several methodologies integrate information on hazard (H) and vulnerability (V) using a «Classic» Risk (R) model for risk analysis. However, this combination of variables generally overestimates the risk in places where the frequency of flooding is low. In this work we propose a model that we call «Adjusted Risk» (AR) that integrates values of urban proximity (p) to bodies of water, as a tool to assess the risk of floods. The comparison between the R and AR models showed a higher efficiency of AR to reproduce the frequency of floods for 210 cities in Veracruz, while R overestimated the level of risk in cities with low frequency of floods. The correlation values associated with the frequency of flood events for a period of 45 years (1970-2015), allow to establish the utility of the AR model to evaluate the risk of urban floods when using different scales of analysis. [ABSTRACT FROM AUTHOR]
- Published
- 2022
- Full Text
- View/download PDF
5. ANALYTIC HIERARCHY PROCESS (AHP): UMA DEFINIÇÃO DO RISCO À INUNDAÇÃO PARA A AMAZÔNIA SETENTRIONAL.
- Author
-
Ribeiro Araújo Júnior, Antônio Carlos and Tavares Júnior, Stélio Soares
- Abstract
Working with environmental risks is to work with different variables that can interfere in the process of genesis and / or intensification of phenomena harmful to society. The search for alternatives to probabilistic assessment of natural aggressive phenomena to society, that is, risks have been a constant. Therefore, to suggest the Analytic Hierarchy Process (AHP), free software provided by the Instituto Nacional de Pesquisas Espaciais (INPE) as a means to this end seems logical, since it allows the weighting of different elements and their subsequent hierarchization for diagnosis and decisions-making against the risks. Thus, the objective is to analyze the environmental variables that support the genesis and / or intensification of flood risk areas in the city of Boa Vista-RR and subsequently map them through the AHP. We used slope data, flood distance of main drainage, watersheds of secondary drainage, and land cover and use for hierarchy in the AHP, through the Linguagem Espacial para Geoprocessamento Algébrico (LEGAL), which allows weightings between the listed elements. AHP proved to be effective geoprocessing software in measuring flood risk areas and producing products to deal with present and future risks. [ABSTRACT FROM AUTHOR]
- Published
- 2020
- Full Text
- View/download PDF
6. Study of the Climate Change Effect on the Snow Water Resources in the Spanish Mountains
- Author
-
Lastrada Marcén, José Eduardo
- Subjects
Agua de nieve equivalente ,Water resources ,Climate change models ,Densidad nival ,INGENIERIA DEL TERRENO ,Modelo hidrológico ASTER ,Riesgo de inundaciones ,Recursos hídricos ,Snow Water Equivalent ,Modelos de cambio climático ,ASTER hydrological model ,Snow ,Programa ERHIN ,Flood risk ,Climate change ,Cambio climático ,Nieve ,ERHIN Program ,Snow density - Abstract
[ES] El cambio climático indudablemente afectará los eventos de nieve ya que se espera que la temperatura y la precipitación cambien en el futuro. Las montañas españolas se ven especialmente afectadas por esta situación, ya que el almacenamiento de nieve se concentra en periodos muy concretos del año hidrológico y juega un papel muy importante en la gestión de los recursos hídricos. En este estudio se realiza en primer lugar un análisis del comportamiento de los fenómenos complejos relacionados con la nieve en las cuatro principales regiones montañosas de España en los próximos 50 años. El modelo hidrológico ASTER se aplica utilizando como insumo básico datos de temperatura y precipitación, estimados bajo un escenario de cambio climático. Los resultados muestran diferentes cambios en los caudales máximos y promedio esperados, dependiendo de la muy diferente magnitud y signo de los cambios en la precipitación. Puede producirse un aumento de los episodios de inundación como consecuencia de una compleja relación entre los cambios en las precipitaciones y un aumento de las intensidades máximas de deshielo que oscilan entre el 2,1% en los Pirineos y el 7,4% en la Cordillera Cantábrica. Sin embargo, los patrones comunes se muestran en una menor duración de las reservas de masa de nieve, que se espera que ocurra 45 días antes para la Cordillera Cantábrica, y alrededor de 30 días para el resto de las regiones montañosas estudiadas. Los cambios observados también conducen a una disminución preocupante del efecto regulador de los fenómenos relacionados con la nieve en los ríos españoles, con una disminución de la acumulación media de nieve que oscila entre un 28% para Pirineos y Sierra Nevada y un 42% para el Sistema Central y la Cordillera Cantábrica. Se espera una disminución del caudal medio, que fluctúe desde el 2,4% en los Pirineos hasta el 7,3% en la Cordillera Cantábrica, aumentando únicamente en el Sistema Central un 4,0%, siendo necesario desarrollar nuevas medidas de adaptación al cambio climático. Por otro lado, con el fin de lograr una mejor estimación del Equivalente de agua de nieve (SWE) utilizando una red meteorológica y de profundidad de nieve (SD) económica y extensa; y que mejore la calibración del modelo hidrológico ASTER, se proporcionan nuevos modelos de regresión de densidad de nieve (SDEN). A partir del gran banco de datos de densidad de nieve (SDEN) existente para los Pirineos españoles, siendo una de las zonas más importantes y mejor monitorizadas del mundo, se evalúan modelos de regresión lineal simple y múltiple que relacionan SDEN con la intra-dependencia del tiempo anual y otros factores como la precipitación acumulada estacional, las temperaturas promedio de 7 días, la profundidad de la nieve (SD) y la elevación. Los resultados mostraron tasas de densificación similares sin mostrar un patrón espacial. La tasa de densificación para el conjunto de muestras manuales se fijó en 1,2 x 10-3 kg/L/día, muy similar al conjunto de medidas automáticas. Los resultados aumentan el conocimiento sobre SDEN en los Pirineos, aunque hay que tener en cuenta la alta variabilidad espacial encontrada. Finalmente, se estudian los efectos que el cambio climático puede tener en las inundaciones para un caso de estudio de una cuenca nival de la Cordillera Cantábrica. Usando diferentes modelos climáticos, considerando un escenario de emisiones de gases de efecto invernadero comparativamente altas (RCP8.5), con datos diarios de temperatura y precipitación entre los años 2007-2070, y comparando los resultados en términos relativos, se estiman el caudal y la variación del riesgo de inundación debido al cambio climático. En el caso concreto de Reinosa, el modelo climático MRI-CGCM3 muestra que el cambio climático provocará un aumento significativo de habitantes potenciales afectados y daños económicos por riesgo de inundaciones., [CA] El canvi climàtic afectarà indubtablement els esdeveniments de neu ja que s'espera que la temperatura i la precipitació canvien en el futur. Les muntanyes espanyoles estan especialment afectades per aquesta situació, ja que l'emmagatzematge de neu es concentra en períodes molt concrets de l'any hidrològic i juga un paper molt important en la gestió dels recursos hídrics. En aquest estudi es fa una anàlisi del comportament dels fenòmens complexos relacionats amb la neu a les quatre principals regions muntanyoses d'Espanya en els propers 50 anys. El model hidrològic ASTER s'aplica utilitzant com a insum bàsic dades de temperatura i precipitació, estimades sota un escenari de canvi climàtic. Els resultats mostren diferents canvis en els cabals màxims i la mitjana esperada, depenent de la molt diferent magnitud i signe dels canvis en la precipitació. Es pot produir un augment dels episodis d'inundació com a conseqüència d'una relació complexa entre els canvis en les precipitacions i un augment de les intensitats màximes de desglaç que oscil¿len entre el 2,1% als Pirineus i el 7,4% a la Serralada. Cantàbrica. Tot i això, els patrons comuns es mostren en una menor duració de les reserves de massa de neu, que s'espera que ocórreguen 45 dies abans per a la Serralada Cantàbrica, i al voltant de 30 dies per a la resta de les regions muntanyoses estudiades. Els canvis observats també condueixen a una disminució preocupant de l'efecte regulador dels fenòmens relacionats amb la neu als rius espanyols, amb una disminució de l'acumulació mitjana de neu que oscil¿la entre un 28% per als Pirineus i Sierra Nevada i un 42% per al Sistema Central i la Serralada Cantàbrica. S'espera una disminució del cabal mitjà, que fluctua des del 2,4% als Pirineus fins al 7,3% a la Serralada Cantàbrica, augmentant únicament al Sistema Central un 4,0%, i cal desenvolupar noves mesures d'adaptació al canvi climàtic. D'altra banda, per tal d'aconseguir una estimació millor de l'Equivalent d'aigua de neu (SWE) utilitzant una xarxa meteorològica i de profunditat de neu (SD) econòmica i extensa que condueix a millorar el calibratge del model hidrològic ASTER, es proporcionen nous models de regressió de densitat de neu (SDEN). A partir del banc de dades més significatiu de densitat de neu (SDEN) als Pirineus espanyols, i sent una de les zones més importants i millor monitorizades del mon per a mostrejos manuals in situ i mesures automàtiques, s'avaluen models de regressió lineal simple i múltiple que relacionen SDEN amb intra-dependència del temps anual i altres factors com la precipitació acumulada estacional, les temperatures mitjana de 7 dies, la profunditat de la neu (SD) i l'elevació. La precipitació estacional acumulada va presentar una influència més dominant que la precipitació diària, sent usualment el segon factor determinant de SDEN més dominant, seguit per la temperatura. Les temperatures mitjanes van mostrar el millor ajustament a SDEN. Els resultats van mostrar taxes de densificació similars, sense mostrar un patró espacial. La taxa de densificació per al conjunt de mostres manuals es va fixar en 1,2 x 10-3 kg/L/dia, molt semblant al conjunt de mesures automàtiques. Els resultats augmenten el coneixement sobre SDEN als Pirineus, encara que cal tindre en compte l'alta variabilitat espacial trobada. Finalment, s'estudien els efectes que el canvi climàtic pot tindre en les inundacions per a un cas d'estudi d'una conca nival de la Serralada Cantàbrica. Usant diferents models climàtics, considerant un escenari d'emissions de gasos d'efecte hivernacle comparativament altes (RCP8.5), amb dades diàries de temperatura i precipitació dels anys 2007-2070, i comparant els resultats en termes relatius, la taxa de flux i la variació del ri, [EN] Climate change undoubtedly will affect snow events as temperature and precipitation are expected to change in the future. Spanish mountains are especially affected by that situation since snow storage is there focused on very specific periods of the hydrological year and plays a very important role in the management of water resources. In this study, an analysis of the behaviour of the complex snow-related phenomena in the four main mountain regions of Spain in the next 50 years is conducted. The ASTER hydrological model is applied using temperature and precipitation data as basic input, estimated under a climate change scenario. Results show different changes in the maximum and average expected flows, depending on the very different magnitude and sign of changes in precipitation. An increase of flooding episodes may occur as a result of a complex relationship between changes in precipitation and an increase in maximum snowmelt intensities that range from 2.1% in the Pyrenees to 7.4% in the Cantabrian Mountains. However, common patterns are shown in a shorter duration of the snow bulk reserves, expected to occur 45 days earlier for the Cantabrian Mountains and about 30 days for the rest of the studied mountain regions. Changes observed also lead to a concerning decrease in the regulatory effect of the snow-related phenomena in the Spanish rivers, with a decrease in the average snow accumulation that ranges from about 28% for the Pyrenees and Sierra Nevada to 42% for the Central System and the Cantabrian Mountains. A decrease in average flow is expected, fluctuating from 2.4% in the Pyrenees to 7.3% in Cantabrian Mountains, only increasing in the Central System by 4.0%, making all necessary to develop new adaptation measures to climate change. To achieve a better estimation of Snow Water Equivalent (SWE) using an economical and extensive snow depth (SD) and meteorological network that leads to improving the calibration of ASTER hydrological model, new snow density (SDEN) regression models are given in this work. Based on the most significant dataset of snow density (SDEN) in the Spanish Pyrenees for on-site manual samples and automatic measurements, as one of the most important and best-monitored areas in the world, single and multiple linear regression models are evaluated that relate SDEN with intra-annual time dependence and other drivers such as the seasonal accumulated precipitation, 7-day average temperatures, snow depth (SD) and elevation. The seasonal accumulated precipitation presented a more dominant influence than daily precipitation, usually the second most dominant SDEN driver, followed by temperature. Average temperatures showed the best fitting to SDEN. The results showed similar densification rates without showing a spatial pattern. The densification rate for the set of manual samples was 1.2 x 10-3 kg/L/day, very similar to the set of automatic measurements. The results increase knowledge on SDEN in the Pyrenees, although the high spatial variability that has been found must be regarded. Finally, climate change's effects on floods are studied in a case study of a snow basin in the Cantabrian Mountains. Using different climate models, regarding a scenario of comparatively high greenhouse gas emissions (RCP8.5), with daily temperature and precipitation data from the years 2007-2070, and comparing results in relative terms, flow rate and flood risk variation due to climate change are estimated. In the specific case of Reinosa, the MRI-CGCM3 climate model shows that climate change will cause a significant increase of potentially affected inhabitants and economic damage due to flood risk
- Published
- 2022
7. A new model to analyze urban flood risk. Case study: Veracruz, Mexico
- Author
-
Zúñiga Tovar, Ángel Emmanuel, Novelo Casanova, David A., Domínguez Sarmiento, Christian, García Benítez, Marcelino, Piña, Violeta, Zúñiga Tovar, Ángel Emmanuel, Novelo Casanova, David A., Domínguez Sarmiento, Christian, García Benítez, Marcelino, and Piña, Violeta
- Abstract
Due to their frequency and magnitude, urban floods affect different regions of the world. For this reason, several methodologies integrate information on hazard (H) and vulnerability (V) using a «Classic» Risk (R) model for risk analysis. However, this combination of variables generally overestimates the risk in places where the frequency of flooding is low. In this work we propose a model that we call «Adjusted Risk» (AR) that integrates values of urban proximity (p) to bodies of water, as a tool to assess the risk of floods. The comparison between the R and AR models showed a higher efficiency of AR to reproduce the frequency of floods for 210 cities in Veracruz, while R overestimated the level of risk in cities with low frequency of floods. The correlation values associated with the frequency of flood events for a period of 45 years (1970-2015), allow to establish the utility of the AR model to evaluate the risk of urban floods when using different scales of analysis., Debido a su frecuencia y magnitud, las inundaciones urbanas afectan a diferentes regiones del mundo. Por esta razón, varias metodologías integran información sobre peligro (P) y vulnerabilidad (V) utilizando un modelo de Riesgo «Clásico» (R) para el análisis de riesgos. Sin embargo, esta combinación de variables generalmente sobreestima el riesgo en lugares donde la frecuencia de inundaciones es baja. En este trabajo proponemos un modelo al que llamamos «Riesgo Ajustado» (RA) que integra valores de proximidad urbana (p) a cuerpos de agua, como herramienta para evaluar el riesgo de inundaciones. La comparación entre los modelos R y RA mostró una mayor eficiencia de RA para reproducir la frecuencia de inundaciones para 210 ciudades de Veracruz; mientras que R sobreestimó el nivel de riesgo en ciudades con baja frecuencia de inundaciones. Los valores de correlación asociados con la frecuencia de eventos de inundación para un período de 45 años (1970-2015), permiten establecer la utilidad del modelo RA para evaluar el riesgo de inundaciones urbanas cuando se utilizan diferentes escalas de análisis.
- Published
- 2022
8. Sistema de Información para Detección de Crecientes Súbitas en la Cuenca del Río Manzanares en Santa Marta, Colombia.
- Author
-
Quintero, Wilmer, Robles, Carlos A., and Viloria, Adolfo M.
- Abstract
This paper presents an information system that processes the installed equipment data to monitor soil moisture, precipitation and water level of the Manzanares River, as part of a program for the early warning of flash flood in the Manzanares River Basin in Santa Marta, Colombia. The system detects flash floods and emits three types of alert, yellow, orange and red, depending on the level of the river. For technological development, Java Enterprise Edition was used, in conjunction with programming interfaces such as Google Maps, Google Cloud Messaging, Google Play Services and a relational database to store information. The results demonstrate the importance of information systems as a tool to alert communities at risk of flooding. [ABSTRACT FROM AUTHOR]
- Published
- 2017
- Full Text
- View/download PDF
9. Efecto de la construcción de la presa de 'La Gallinera' en el perfil de riesgo de inundación del municipio de Oliva (Comunidad Valenciana)
- Author
-
Escuder Bueno, Ignacio, Castillo Rodríguez, Jesica Tamara, Universitat Politècnica de València. Departamento de Ingeniería Hidráulica y Medio Ambiente - Departament d'Enginyeria Hidràulica i Medi Ambient, Álvarez Sánchez, Laura, Escuder Bueno, Ignacio, Castillo Rodríguez, Jesica Tamara, Universitat Politècnica de València. Departamento de Ingeniería Hidráulica y Medio Ambiente - Departament d'Enginyeria Hidràulica i Medi Ambient, and Álvarez Sánchez, Laura
- Abstract
[ES] Este trabajo tiene como objetivo analizar el impacto de la construcción de la presa de la Gallinera en el riesgo de inundación en el término municipal de Oliva (Valencia). Oliva desde hace treinta años mantiene el record histórico de precipitación máxima diaria en España (817 mm). Debido a estas fuertes precipitaciones que dan lugar a grandes inundaciones, se realizó un ambicioso plan para reducir el riesgo de inundación que contemplaba entre otras medidas, la construcción de la presa La Gallinera. A día de hoy se han ejecutado las otras medidas estructurales del plan, pero no se ha construido la presa por lo que es necesario evaluar si estas medidas son suficientes para cumplir con el objetivo de dicho plan contra inundaciones. Para ello se realizará un modelo cuantitativo de riesgo con una arquitectura que incluya la presa y las demás medidas anteriormente propuestas, se analizarán los datos de poblaciones y avenidas actuales y se obtendrán las consecuencias en vidas dañadas y pérdidas materiales, tanto en el escenario de fallo, como en el de no fallo de la presa. Además, se modificará el modelo para que incluya proyecciones futuras considerando el cambio climático y todo lo que ello implica, no solo considerando cambios en las variables hidrológicas, sino teniendo en cuenta todas las demás variables que puedan verse afectadas ante este nuevo escenario. Los programas que se utilizarán con el fin de analizar el riesgo son "ipresas calc" y "sobek" en los que se modelizarán las posibles avenidas y sus efectos. Los resultados que se obtengan se analizarán en términos anualizados de pérdidas de vida y pérdidas económicas y para concluir, se analizarán distintos indicadores de riesgos con el objetivo de evaluar la efectividad y eficiencia de la presa., [EN] This work aims to analyze the impact of the construction of the Gallinera dam on the high flood risk municipality of Oliva (Valencia). Oliva has held the historical record for maximum daily rainfall in Spain for thirty years (817 mm). Due to these heavy rains that give rise to large floods, an ambitious plan was carried out to reduce the risk of flooding, which included, among other measures, the construction of the "La Gallinera" dam. To date, the other structural measures of the plan have been carried out, but the dam has not been built, so it is necessary to assess whether these measures are sufficient to meet the objective of said plan against floods. For this, a quantitative risk model will be made with an architecture that includes the dam and the other measures previously proposed, the data of current populations and avenues will be analyzed and the consequences will be obtained in damaged lives and material losses, both in the failure scenario, as in the non-failure of the dam. In addition, the model will be modified to include future projections considering climate change and all that this implies, not only considering changes in hydrological variables, but also taking into account all other variables that may be affected by this new scenario. The programs that will be used in order to analyze the risk are "ipresas calc" and "sobek" in which the possible floods and their effects will be modeled. The results obtained will be analyzed in annualized terms of loss of life and economic losses and to conclude, different risk indicators will be analyzed in order to evaluate the effectiveness and efficiency of the dam.
- Published
- 2021
10. Efecto de la construcción de la presa de 'La Gallinera' en el perfil de riesgo de inundación del municipio de Oliva (Comunidad Valenciana)
- Author
-
Álvarez Sánchez, Laura
- Subjects
INGENIERIA HIDRAULICA ,Análisis del riesgo ,Flood risk management ,Risk analysis ,Risk model ,Modelo de riesgos ,Gestión del riesgo de inundación ,Máster Universitario en Ingeniería Hidráulica y Medio Ambiente-Màster Universitari en Enginyeria Hidràulica i Medi Ambient ,Presas ,Riesgo de inundaciones - Abstract
[ES] Este trabajo tiene como objetivo analizar el impacto de la construcción de la presa de la Gallinera en el riesgo de inundación en el término municipal de Oliva (Valencia). Oliva desde hace treinta años mantiene el record histórico de precipitación máxima diaria en España (817 mm). Debido a estas fuertes precipitaciones que dan lugar a grandes inundaciones, se realizó un ambicioso plan para reducir el riesgo de inundación que contemplaba entre otras medidas, la construcción de la presa La Gallinera. A día de hoy se han ejecutado las otras medidas estructurales del plan, pero no se ha construido la presa por lo que es necesario evaluar si estas medidas son suficientes para cumplir con el objetivo de dicho plan contra inundaciones. Para ello se realizará un modelo cuantitativo de riesgo con una arquitectura que incluya la presa y las demás medidas anteriormente propuestas, se analizarán los datos de poblaciones y avenidas actuales y se obtendrán las consecuencias en vidas dañadas y pérdidas materiales, tanto en el escenario de fallo, como en el de no fallo de la presa. Además, se modificará el modelo para que incluya proyecciones futuras considerando el cambio climático y todo lo que ello implica, no solo considerando cambios en las variables hidrológicas, sino teniendo en cuenta todas las demás variables que puedan verse afectadas ante este nuevo escenario. Los programas que se utilizarán con el fin de analizar el riesgo son "ipresas calc" y "sobek" en los que se modelizarán las posibles avenidas y sus efectos. Los resultados que se obtengan se analizarán en términos anualizados de pérdidas de vida y pérdidas económicas y para concluir, se analizarán distintos indicadores de riesgos con el objetivo de evaluar la efectividad y eficiencia de la presa., [EN] This work aims to analyze the impact of the construction of the Gallinera dam on the high flood risk municipality of Oliva (Valencia). Oliva has held the historical record for maximum daily rainfall in Spain for thirty years (817 mm). Due to these heavy rains that give rise to large floods, an ambitious plan was carried out to reduce the risk of flooding, which included, among other measures, the construction of the "La Gallinera" dam. To date, the other structural measures of the plan have been carried out, but the dam has not been built, so it is necessary to assess whether these measures are sufficient to meet the objective of said plan against floods. For this, a quantitative risk model will be made with an architecture that includes the dam and the other measures previously proposed, the data of current populations and avenues will be analyzed and the consequences will be obtained in damaged lives and material losses, both in the failure scenario, as in the non-failure of the dam. In addition, the model will be modified to include future projections considering climate change and all that this implies, not only considering changes in hydrological variables, but also taking into account all other variables that may be affected by this new scenario. The programs that will be used in order to analyze the risk are "ipresas calc" and "sobek" in which the possible floods and their effects will be modeled. The results obtained will be analyzed in annualized terms of loss of life and economic losses and to conclude, different risk indicators will be analyzed in order to evaluate the effectiveness and efficiency of the dam.
- Published
- 2021
11. Plan de actuación municipal ante riesgo de inundaciones en Oropesa del Mar
- Author
-
Bosch Bosch, Francisco
- Subjects
Plan de actuación ,Máster Universitario en Ingeniería de Caminos, Canales y Puertos-Màster Universitari en Enginyeria de Camins, Canals i Ports ,Análisis del riesgo ,INGENIERIA DEL TERRENO ,Oropesa del Mar ,Riesgo de inundaciones ,URBANISTICA Y ORDENACION DEL TERRITORIO - Abstract
[ES] Se trata de un estudio de carácter informativo y preventivo en el que se establecen las características propias del municipio frente a episodios de inundaciones y se plantean las actuaciones necesarias para hacer frente a situaciones de riesgo o emergencia grave. Para ello, se presenta un estudio en el que se pretende abarcar los siguientes puntos: Descripción del término municipal e infraestructuras. Análisis pluviométrico. Cálculo de la red de alcantarillado. Conclusiones y análisis del riesgo. Redacción estructura y organización plan, operatividad e implantación y mantenimiento. Montaje documento completo.
- Published
- 2020
12. Plan de actuación municipal ante riesgo de inundaciones en Oropesa del Mar
- Author
-
Martínez Ibáñez, Víctor, Palencia Jiménez, José Sergio, Universitat Politècnica de València. Departamento de Ingeniería del Terreno - Departament d'Enginyeria del Terreny, Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports, Bosch Bosch, Francisco, Martínez Ibáñez, Víctor, Palencia Jiménez, José Sergio, Universitat Politècnica de València. Departamento de Ingeniería del Terreno - Departament d'Enginyeria del Terreny, Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports, and Bosch Bosch, Francisco
- Abstract
[ES] Se trata de un estudio de carácter informativo y preventivo en el que se establecen las características propias del municipio frente a episodios de inundaciones y se plantean las actuaciones necesarias para hacer frente a situaciones de riesgo o emergencia grave. Para ello, se presenta un estudio en el que se pretende abarcar los siguientes puntos: Descripción del término municipal e infraestructuras. Análisis pluviométrico. Cálculo de la red de alcantarillado. Conclusiones y análisis del riesgo. Redacción estructura y organización plan, operatividad e implantación y mantenimiento. Montaje documento completo.
- Published
- 2020
13. Respuestas y propuestas ante el riesgo de inundación de las ciudades colombianas.
- Author
-
Idarraga, Freddy Leonardo Franco
- Subjects
- *
FLOOD control , *FLOODS , *FLOOD damage prevention , *RIVER engineering , *STREAM restoration , *URBAN planning & the environment , *RIVERS , *GOVERNMENT policy - Abstract
Due to the inadequate conjunction between water wealth and urban development, we are constantly having to deal with tragedy, spending huge resources on ongoing repair work on constructions and on helping the lood victims. However, no country is exempt from urban loods, its consequences may be vary according to the characteristics of the cities and their relationships with their bodies of water. After reviewing disaster statistics and the basic concepts of risk, and evaluating typical engineering proposals, this paper introduces some background to the problems in Colombia, and proposes a new form of river management as a solution. [ABSTRACT FROM AUTHOR]
- Published
- 2010
- Full Text
- View/download PDF
14. Sistema de Información para Detección de Crecientes Súbitas en la Cuenca del Río Manzanares en Santa Marta, Colombia
- Author
-
Adolfo M Viloria, Carlos Robles, and Wilmer Quintero
- Subjects
geography ,geography.geographical_feature_category ,riesgo de inundaciones ,Strategy and Management ,sistema de alerta temprana ,Drainage basin ,interfaz de programación ,Geotechnical Engineering and Engineering Geology ,Industrial and Manufacturing Engineering ,Computer Science Applications ,General Energy ,Flash flood ,sistema de información ,plataforma Java ,Humanities ,Food Science - Abstract
espanolEn este articulo se presenta un sistema de informacion que procesa los datos de equipos instalados para monitorear la humedad del suelo, precipitacion y nivel de agua del rio Manzanares como parte de un programa de alerta temprana de creciente subita en la Cuenca del Rio Manzanares en Santa Marta, Colombia. El sistema detecta crecientes subitas y emite tres tipos de alerta, amarilla, naranja y roja, dependiendo del nivel del rio. Para el desarrollo tecnologico se utilizo Java Enterprise Edition en conjunto con interfaces de programacion como Google Maps, Google Cloud Messaging, Google Play Services y una base de datos relacional para almacenar la informacion. Los resultados demuestran la importancia de los sistemas de informacion como herramienta para alertar a las comunidades en riesgo de inundacion. EnglishThis paper presents an information system that processes the installed equipment data to monitor soil moisture, precipitation and water level of the Manzanares River, as part of a program for the early warning of flash flood in the Manzanares River Basin in Santa Marta, Colombia. The system detects flash floods and emits three types of alert, yellow, orange and red, depending on the level of the river. For technological development, Java Enterprise Edition was used, in conjunction with programming interfaces such as Google Maps, Google Cloud Messaging, Google Play Services and a relational database to store information. The results demonstrate the importance of information systems as a tool to alert communities at risk of flooding.
- Published
- 2017
- Full Text
- View/download PDF
15. Influencia del fenómeno de La Niña en la vulnerabilidad a inundaciones de las quebradas Santa librada y Curí, ubicadas en el sector de los barrios Arizona, Santa Librada Norte y La Fortaleza de la Localidad de Usme
- Author
-
Gómez-Chávez, Paula Alejandra, Romero-Capera, James Nicolás, and Córdoba-Romero, Henry Alberto
- Subjects
POBLACIÓN ,SIMULACIÓN ,VULNERABILIDAD TERRITORIAL ,ENOS ,FENÓMENO DE LA NIÑA ,USME ,FLUJO ,ANÁLISIS ,RIESGO DE INUNDACIONES ,RIESGO - Abstract
Trabajo de Investigación Las inundaciones son unas de las catástrofes más comunes en Colombia, debido a las condiciones geográficas y topográficas del país. Con la intención de mitigar daños, y facilitar la toma de decisiones por parte de las autoridades pertinentes, se determinó la vulnerabilidad a una inundación teniendo en cuenta el fenómeno de la Niña en las quebradas Santa Librada y Curí. Pregrado Ingeniero Civil 1. INTRODUCCIÓN. 2. ANTECEDENTES 3. PLANTEAMIENTO DEL PROBLEMA 4. OBJETIVOS 5. JUSTIFICACIÓN 6. DELIMITACION 7. MARCO DE REFERENCIA 8. DISEÑO METODOLOGICO 9. SITUACION DE LA ZONA DE ESTUDIO 10. RECOLECCION DE DATOS 11. USO DE ARCGIS 12. CARACTERÍSTICAS DE LA CUENCA 13. CURVAS IDF 14. CALCULO DE CAUDAL 15. REALIZACION DE HIDROGRAMAS POR HEC-RAS 16. MODELACIÓN MEDIANTE HEC-RAS 17. ANALISIS CONCLUSIONES RECOMENDACIONES BIBLIOGRAFÍA ANEXOS
- Published
- 2018
16. Percepción social en la gestión del riesgo de inundación en un área mediterránea (Costa Brava, España)
- Author
-
Lara San Martín, Alejandro, Ribas Palom, Anna, Vila Subirós, Josep, and Universitat de Girona. Institut de Medi Ambient
- Subjects
Tesis i dissertacions acadèmiques ,Floods management ,Participación social ,Gestió de les inundacións ,Social participation ,Riesgo de inundaciones ,Participació social ,Gestión de inundaciones ,Costa Brava (Catalunya) ,504 - Ciències del medi ambient ,Risc d'inundacions ,502 - Natura. Estudi, conservació i protecció de la natura ,Floods risk - Abstract
This research aims to understand the perception of civil society both organized and unorganized, regarding the problem of floods and their management. This is based on a case study of the following municipalities; Calonge, Torroella de Montgrí and Tossa de Mar. This is achieved through a mixed methodology that combines qualitative and quantitative aspects and applies three complementary techniques of data collection: a) surveys of residents in flood-prone areas; b) interviews with mayors and technical environments within each of the respective municipalities of the study, and c) Focus Groups sessions with civil society representatives previously defined. The main results show that the flood experience is a determinant to know social perception of flood risk and structural measures have great support by local authorities and residents of areas prone to flooding. However, organized civil society prefers to enhance non-structural measures for the protection and management of flood risk., La presente investigación pretende dar a conocer la percepción de la sociedad civil organizada y no organizada respecto a las inundaciones y su gestión, a partir de un caso de estudio configurado por los municipios de Calonge, Torroella de Montgrí y Tossa de Mar. Para ello se desarrolla una metodología mixta que combina aspectos cualitativos y cuantitativos y se aplican tres técnicas complementarias de recolección de datos: a) encuestas a los residentes de las zonas expuestas a las inundaciones; b) entrevistas a los alcaldes y técnicos de medio ambiente de cada uno de los respectivos municipios de estudio; y c) sesiones de Focus Groups con representantes de la sociedad civil previamente definidos. Los principales resultados establecen que la experiencia con las inundaciones es determinante en la percepción de este riesgo y que las medidas estructurales presentan un gran soporte tanto por parte de las autoridades locales como de los residentes de las zonas expuestas a las inundaciones. Sin embargo, la sociedad civil organizada prefiere potenciar las medidas no estructurales destinadas a la protección y convivencia con el riesgo de inundación.
- Published
- 2012
17. Análisis para la gestión del riesgo de inundaciones en Bogotá un enfoque desde la construcción social del riesgo
- Author
-
Niño Fierro, Karen Natalia and Obregón Neira, Nelson
- Subjects
Maestría en planeación urbana y regional - Tesis y disertaciones académicas ,Construcción social del riesgo ,Bogotá ,Riesgo de inundaciones - Abstract
Colombia, al igual que otros países en vías de desarrollo, enfrenta grandes retos que amenazan su futuro y están relacionadas a la gobernabilidad institucional, la degradación ambiental, la pobreza, la desigualdad en el acceso a las oportunidades, la falta de planificación hacia el futuro. Estas debilidades se acentúan cuando el país está expuesto a fenómenos de la naturaleza cuyo impacto no se puede controlar y que son más severos por la acción humana, lo que confirma un proceso de construcción social del riesgo en el país. Las consecuencias sociales, ambientales y económicas para el país del fenómeno de la niña 2010-2011 produjeron la necesidad de fortalecer el conocimiento sobre el riesgo y su priorización en la agenda pública. Este documento es un aporte a esa discusión. Colombia, just as other developing countries, faces great challenges that threaten its future and are related with the institutional governance, environmental degradation, poverty, unequal access to opportunities, and lack of planning towards the future. These weaknesses are accentuated when the country is exposed to natural phenomenon whose impact cannot be controlled and becomes more severe because of human action, confirming a process of social construction of risk in the country. The social, environmental and economic consequences for the country of La Niña 2010-2011 phenomenon, produced the need to strengthen the knowledge about risk and its prioritization in the public agenda. This paper is a contribution to this discussion. Magíster en Planeación Urbana y Regional Maestría
- Published
- 2012
18. Respuestas y propuestas ante el riesgo de inundación de las ciudades colombianas
- Author
-
Franco Idarraga, Freddy Leonardo
- Subjects
recuperación de ríos urbanos ,riesgo de inundaciones ,urban river restoration ,Colombian cities ,flood risk ,Ciudades colombianas - Abstract
Debido a la inadecuada conjunción de riqueza hídrica y desarrollo urbano, vivimos en constante tragedia, gastando enormes recursos en continuas reconstrucciones y en socorro a víctimas de inundaciones. Si bien las inundaciones urbanas son eventos a los que ningún país escapa, sus consecuencias pueden variar según las características de las ciudades y de las relaciones que tengan con sus corrientes de agua. Así, el presente documento, tras una revisión de estadísticas de desastres, de los conceptos básicos del riesgo y de la evaluación de las propuestas clásicas de la ingeniería, plantea algunas respuestas al porqué de este problema en Colombia y propone como solución una nueva forma de gestión de los ríos. Due to the inadequate conjunction between water wealth and urban development, we are constantly having to deal with tragedy, spending huge resources on ongoing repair work on constructions and on helping the flood victims. However, no country is exempt from urban floods, its consequences may be vary according to the characteristics of the cities and their relationships with their bodies of water. After reviewing disaster statistics and the basic concepts of risk, and evaluating typical engineering proposals, this paper introduces some background to the problems in Colombia, and proposes a new form of river management as a solution.
- Published
- 2010
19. Respuestas y propuestas ante el riesgo de inundación de las ciudades colombianas
- Author
-
Freddy Leonardo Franco Idarraga
- Subjects
urban river restoration ,History ,recuperación de ríos urbanos ,Recuperación de ríos urbanos ,Polymers and Plastics ,36 Problemas y servicios sociales, asociaciones / Social problems and social services ,flood risk ,Riesgo de inundaciones ,Industrial and Manufacturing Engineering ,lcsh:TA1-2040 ,Urban river restoration ,riesgo de inundaciones. Colombian cities ,Flood risk ,Colombian cities ,Business and International Management ,lcsh:Engineering (General). Civil engineering (General) ,Ciudades colombianas ,33 Economía / Economics ,55 Ciencias de la tierra / Earth sciences and geology - Abstract
Debido a la inadecuada conjunción de riqueza hídrica y desarrollo urbano, vivimos en constante tragedia, gastando enormes recursos en continuas reconstrucciones y en socorro a víctimas de inundaciones. Si bien las inundaciones urbanas son eventos a los que ningún país escapa, sus consecuencias pueden variar según las características de las ciudades y de las relaciones que tengan con sus corrientes de agua. Así, el presente documento, tras una revisión de estadísticas de desastres, de los conceptos básicos del riesgo y de la evaluación de las propuestas clásicas de la ingeniería, plantea algunas respuestas al porqué de este problema en Colombia y propone como solución una nueva forma de gestión de los ríos.Due to the inadequate conjunction between water wealth and urban development, we have lived in continuous tragedy, spending huge resources on ongoing reconstructions and helping the flood victims. However, the urban floods are events to which no country is exempted, its consequences may be varying according to the characteristics of the cities and the relationships with its water bodies. In this line, the document, after a review of disaster statistics, the basic concepts of risk and the evaluation of the classical engineering proposals, introduces some background of the problems in Colombia, and proposes like a solution, a new form of river management.
- Published
- 2010
20. Riscos associados ao sistema de controle de enchentes no Vale do Rio dos Sinos (RS-Brasil)
- Author
-
Penteado, Adriana de Fátima, Petry, Sandro Henrique, Ross, Jurandyr Luciano Sanches, Penteado, Adriana de Fátima, Petry, Sandro Henrique, and Ross, Jurandyr Luciano Sanches
- Abstract
Partie de la plaine inférieure du Rio dos Sinos (RS-Brésil) présente une très haute densité d’occupation urbaine-industrielle naturellement touché par les débordements d’eau. Pour éviter ce phénomène, ouvrages de confinement et drainages ont eté réalisées. Le but de cette étude est d’analyser les risques associés à l’état de la partie installée du projet du Système. Le phénomène naturel a été problématisée, l’engin de Contrôle des débordements a été étudié, et par des rapports et observations les facteurs de risque ont été analysés., Parte da planície inferior do rio dos Sinos (RS-Brasil) apresenta grande adensamento urbano-industrial em áreas naturalmente atingidas por cheias. Para prevenir contra este fenômeno iniciou-se em 1970 a execução do Sistema de Controle de Enchentes no Vale do Rio dos Sinos – SCEVRS. O objetivo deste trabalho é analisar os fatores de risco associados ao estado da parte instalada. Contextualizou-se o problema das enchentes e buscou-se a compreensão do funcionamento do Sistema. Depois, mediante relatos técnicos e observações de campo, analisaram-se os problemas., Parte de la llanura baja del Rio dos Sinos (RS-Brasil) tiene una alta densidad de uso urbano/industrial en tierras naturalmente afectadas por inundaciones. Para prevenir contra este fenómeno fueron ejecutadas obras de retención y drenaje. El propósito de este estudio es analizar los factores de riesgo asociados al estado de la parte ya instalada del proyecto del Sistema de Control de Inundaciones del Valle del Río dos Sinos. Se ha problematizado el fenómeno de las inundaciones, fue estudiado el engeño de Control y a través de entrevistas y observaciones de campo se evaluaron los factores de riesgo., Part of the lower plain of the Rio dos Sinos (RS-Brazil) presents a high density of urban-industrial occupancy in natural-flooding areas. To prevent this phenomenon, retention and drainage works were executed. The aim of this study is to analyze the risk factors associated with the state of the installed part of the project of the Rio dos Sinos Valley Flood Control System. The natural phenomenon was problematized at first, then the Control engine was considered, and by means of reports and field observations the risks were evaluated.
- Published
- 2012
21. Riesgo de inundaciones en tierras alicantinas: método y resultados
- Author
-
Olcina, Jorge, Giménez Ferrer, José Manuel, Universidad de Alicante. Departamento de Análisis Geográfico Regional y Geografía Física, Clima y Ordenación del Territorio, and Grupo de Investigación en Historia y Clima
- Subjects
Inclusion of fluvial courses in street plan ,Incorporación de cursos fluviales a los callejeros ,Escala local ,Análisis Geográfico Regional ,Local scale ,Work methodology ,Riesgo de inundaciones ,Método de trabajo ,Floods risk - Abstract
El análisis geográfico de la peligrosidad natural debe considerar el estudio de los factores naturales, sociales y territoriales que están en el origen de la creación de territorios de riesgo. El crecimiento de los casalicios ha supuesto la incorporación de ramblas y barrancos a los callejeros en un proceso no bien planteado de digestión de elementos naturales generadores de vulnerabilidad. Se presenta el método de trabajo planteado en la investigación elaborada por el grupo de climatología de la Universidad de Alicante y se muestran algunos resultados de la misma. Geographical analysis of natural dangers ought of take into account the study of natural, social and territorial factors that are in origin of development of risk territories. Cities growth has involved the incorporation of minor fluvial courses in street plan how not well posed digestion process of natural elements in cities. It causes much vulnerability problem. This paper offers work's methodology that has been prepared for research team of Laboratoty of Climatology in Alicante University during the last four years and shows some outstanding results.
- Published
- 2002
22. Riesgo de inundaciones en tierras alicantinas. Método y resultados
- Author
-
Olcina Cantos, Jorge and Giménez Ferrer, José M.
- Subjects
Inclusion of fluvial courses in street plan ,Incorporación de cursos fluviales a los callejeros ,Flood risks ,Escala local ,Local scale ,Work methodology ,Riesgo de inundaciones ,Métodos de trabajo - Published
- 2002
23. Riesgo de inundaciones en tierras alicantinas: método y resultados
- Author
-
Universidad de Alicante. Departamento de Análisis Geográfico Regional y Geografía Física, Olcina, Jorge, Giménez Ferrer, José Manuel, Universidad de Alicante. Departamento de Análisis Geográfico Regional y Geografía Física, Olcina, Jorge, and Giménez Ferrer, José Manuel
- Abstract
El análisis geográfico de la peligrosidad natural debe considerar el estudio de los factores naturales, sociales y territoriales que están en el origen de la creación de territorios de riesgo. El crecimiento de los casalicios ha supuesto la incorporación de ramblas y barrancos a los callejeros en un proceso no bien planteado de digestión de elementos naturales generadores de vulnerabilidad. Se presenta el método de trabajo planteado en la investigación elaborada por el grupo de climatología de la Universidad de Alicante y se muestran algunos resultados de la misma., Geographical analysis of natural dangers ought of take into account the study of natural, social and territorial factors that are in origin of development of risk territories. Cities growth has involved the incorporation of minor fluvial courses in street plan how not well posed digestion process of natural elements in cities. It causes much vulnerability problem. This paper offers work's methodology that has been prepared for research team of Laboratoty of Climatology in Alicante University during the last four years and shows some outstanding results.
- Published
- 2002
24. Mapa de precipitaciones máximas diarias y riesgo de inundaciones en la provincia de Alicante
- Author
-
Olcina Cantos, Jorge and Rico Amorós, Antonio Manuel
- Subjects
Climatic cartography ,Precipitaciones máximas en 24 horas ,Periods of recurrence ,Periodo de retorno ,Inondation risk ,Riesgo de inundaciones ,Maximum rainfall in 24 hours ,Cartografía climática - Abstract
Ponencia presentada en: I Congreso de la Asociación Española de Climatología “La climatología española en los albores del siglo XXI”, celebrado en Barcelona del 1 al 3 de diciembre de 1999. [ES]La ordenación de usos en el territorio requiere el manejo de datos actualizados de variables ambientales. Los valores de precipitación máxima en 24 h. son esenciales para la planificación de infraestructuras y el establecimiento de niveles de riesgo en un espacio geográfico. Este trabajo presenta un mapa con datos reales de precipitación diaria máxima en los distintos observatorios de la provincia de Alicante registrados durante el siglo XX. La frecuencia y las repercusiones territoriales que ofrecen los episodios de lluvias torrenciales y las inundaciones en la provincia de Alicante, aconseja revisar la validez de métodos no empíricos basados en cálculos de probabilidad y períodos de retorno, sobre todo a la hora de delimitar zonas de riesgo en documentos de ordenación del territorio. [EN]Land uses order needs management of current environmental databases. Maximum rainfall in one day values are esential for infraestructures planification and fixing risk levels in a geographical land. This work shows a map with real values maximum rainfall in 24 hours at Alicante province during the present century. It shows how little periods of recurrence are adjusted to pluviometric reality in mediterranean lands.
- Published
- 1999
25. Análisis para la gestión del riesgo de inundaciones en Bogotá un enfoque desde la construcción social del riesgo
- Author
-
Obregón Neira, Nelson, Niño Fierro, Karen Natalia, Obregón Neira, Nelson, and Niño Fierro, Karen Natalia
- Abstract
Colombia, al igual que otros países en vías de desarrollo, enfrenta grandes retos que amenazan su futuro y están relacionadas a la gobernabilidad institucional, la degradación ambiental, la pobreza, la desigualdad en el acceso a las oportunidades, la falta de planificación hacia el futuro. Estas debilidades se acentúan cuando el país está expuesto a fenómenos de la naturaleza cuyo impacto no se puede controlar y que son más severos por la acción humana, lo que confirma un proceso de construcción social del riesgo en el país. Las consecuencias sociales, ambientales y económicas para el país del fenómeno de la niña 2010-2011 produjeron la necesidad de fortalecer el conocimiento sobre el riesgo y su priorización en la agenda pública. Este documento es un aporte a esa discusión.
26. Evento de distribución regional: El paquete de servicios MI-SAFE
- Author
-
Peralta, Gloria, Morris, Edward P., and Benavente, Javier
- Subjects
@MISAFE_services ,marismas ,riesgo de inundaciones ,11. Sustainability ,XBeach ,servicios ecosistemicos ,@FP7FAST ,Copernicus - Abstract
El proyecto FAST ha desarrollado el paquete MI-SAFE para ofrecer nuevas herramientas que permitan incluir servicios ecosistémicos en la gestión integrada de zonas costeras. Como parte de los eventos de distribución Nacional/Regional de MI-SAFE, el equipo español del Proyecto Europeo FAST (http://www.fast-space-project.eu/) perteneciente a la Universidad de Cádiz, organizó estas jornadas el 11 de julio de 2017. Este evento se celebró en la Facultad de Ciencias del Mar y Ambientales de la Universidad de Cadiz, con el siguiente programa: 10:00 - 10:10 Bienvenida 10:10 - 10:40 Objetivos del proyecto Europeo FAST 10:40 - 11:40 El paquete MI-SAFE: servicios y valores (incluye utilización del visor MI-SAFE) 11:40 - 12:00 Descanso (coffee break) 12:00 - 12:45 Ejemplos de aplicaciones locales de los servicios MI-SAFE 12:45 - 13:30 Mesa redonda: Servicios MI-SAFE para problemáticas costeras andaluzas Los participantes incluyeron representates de la Junta de Andalucía (Espacios Protegidos), Atlántida Medio Ambiente SL., Departamento de Ecología y Gestión Costera - CSIC-ICMAN, Junta Andalucía (CMAOT), Autoridad Portuaria de Sevilla, Departamento de Geografía Física Y Análisis Geográfico Regional de la Universidad de Sevilla y RQUER TYS
27. Evento De Distribución Regional: El Paquete De Servicios Mi-Safe
- Author
-
Peralta, Gloria and Morris, Edward P.
- Subjects
@MISAFE_services ,marismas ,riesgo de inundaciones ,11. Sustainability ,XBeach ,servicios ecosistemicos ,@FP7FAST ,Copernicus - Abstract
El proyecto FAST ha desarrollado el paquete MI-SAFE para ofrecer nuevas herramientas que permitan incluir servicios ecosistémicos en la gestión integrada de zonas costeras. Como parte de los eventos de distribución Nacional/Regional de MI-SAFE, el equipo español del Proyecto Europeo FAST (http://www.fast-space-project.eu/) perteneciente a la Universidad de Cádiz, organizó estas jornadas el 11 de julio de 2017. Este evento se celebró en la Facultad de Ciencias del Mar y Ambientales de la Universidad de Cadiz, con el siguiente programa: 10:00 - 10:10 Bienvenida 10:10 - 10:40 Objetivos del proyecto Europeo FAST 10:40 - 11:40 El paquete MI-SAFE: servicios y valores (incluye utilización del visor MI-SAFE) 11:40 - 12:00 Descanso (coffee break) 12:00 - 12:45 Ejemplos de aplicaciones locales de los servicios MI-SAFE 12:45 - 13:30 Mesa redonda: Servicios MI-SAFE para problemáticas costeras andaluzas Los participantes incluyeron representates de la Junta de Andalucía (Espacios Protegidos), Atlántida Medio Ambiente SL., Departamento de Ecología y Gestión Costera - CSIC-ICMAN, Junta Andalucía (CMAOT), Autoridad Portuaria de Sevilla, Departamento de Geografía Física Y Análisis Geográfico Regional de la Universidad de Sevilla y RQUER TYS
Catalog
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.