89 results on '"Hélène Toussaint"'
Search Results
2. 630 EO2401, a new peptide immunotherapy against cancer, in combination with nivolumab, induces a strong and durable immune response in patients from the EOADR1–19/SPENCER study
3. Surrogate Constraints for Synchronized Energy Production/Consumption.
4. A Guided Insertion Mechanism for Solving the Dynamic Large-Scale Dial-a-Ride Problem.
5. A project and lift approach for a 2-commodity flow relocation model in a time expanded network.
6. An Efficient A* Like Algorithm for the Scheduling of Unit-Time Jobs with Release and Due Dates under Non Idling Constraints.
7. Managing Time Expanded Networks through Project and Lift: the Lift Issue.
8. Synchronizing Vehicle Routing and Photo-Voltaic Production.
9. Managing a Time Expanded Network through Project-and-Lift.
10. A Filtering System for the Large-Scale Dial-A-Ride Problem With Shared Autonomous Vehicles.
11. Algorithmic Handling of Time Expanded Networks.
12. A Synchronized Knapsack Problem.
13. Optimal 1-Request Insertion for the Pickup and Delivery Problem with Transfers and Time Horizon.
14. Branch-and-Cut for a 2-Commodity Flow Relocation Model with Time Constraints.
15. Surrogate Estimators for Complex Bi-level Energy Management.
16. Surrogate Estimators for Complex Bi-Level Energy Management.
17. Multi-Mode RCPSP with Safety Margin Maximization: Models and Algorithms.
18. Simultaneous Management of Energy Production and Consumption.
19. Dynamic Programming for the Synchronization of Energy Production and Consumption Processes.
20. Pipe-lining Dynamic Programming Processes in Order to Synchronize Energy Production and Consumption.
21. Vehicle driven approaches for non preemptive vehicle relocation with integrated quality criterion in a vehicle sharing system.
22. Synchronizing energy production and vehicle routing.
23. Pipe-lining dynamic programming processes to synchronize both the production and the consumption of energy.
24. Optimal Paths with Impact on a Constraint System: An Application to the 1-Request Insertion for the Pickup and Delivery Problem with Transfers.
25. No-idle Parallel Machine Scheduling of Unit-time Jobs.
26. Layered Network Oriented Approaches for Vehicle Relocation Problems.
27. Models and Algorithms for Natural Disaster Evacuation Problems.
28. Lower and upper bounds for the linear arrangement problem on interval graphs.
29. Models and algorithms for reliability-oriented Dial-a-Ride with autonomous electric vehicles.
30. Partial Enumeration of Minimal Transversals of a Hypergraph.
31. No-idle parallel-machine scheduling of unit-time jobs with a small number of distinct release dates and deadlines.
32. Branch and price with constraint propagation for Resource Constrained Project Scheduling Problem.
33. Branch and Price for Preemptive and Non Preemptive RCPSP Based on Interval Orders on Precedence Graphs.
34. Branch and Price for Preemptive Resource Constrained Project Scheduling Problem Based on Interval Orders in Precedence Graphs.
35. Flow Models for Project Scheduling with Transfer Delays and Financial Constraints.
36. Flow Models for Project Scheduling with Transfer Delays.
37. Optimal Paths with Impact on a Constraint System: An Application to the 1-Request Insertion for the Pickup and Delivery Problem with Transfers
38. 641 Strong immune response to therapeutic vaccination with EO2401 microbiome derived therapeutic vaccine + nivolumab: interim report of the EOGBM1–18/ROSALIE study
39. An effective branch-and-price algorithm for the Preemptive Resource Constrained Project Scheduling Problem based on minimal Interval Order Enumeration.
40. A GRASP×ELS for the vehicle routing problem with basic three-dimensional loading constraints.
41. Flow Polyhedra and Resource Constrained Project Scheduling Problems.
42. Tree based models and algorithms for the preemptive asymmetric Stacker Crane problem.
43. A multi-start evolutionary local search for the two-dimensional loading capacitated vehicle routing problem.
44. Tree based heuristics for the preemptive asymmetric stacker crane problem.
45. Prospective Network Flow Models and Algorithms for Bin Packing Problems.
46. A Phase 1 dose-escalation study to evaluate safety, pharmacokinetics and pharmacodynamics of AsiDNA, a first-in-class DNA repair inhibitor, administered intravenously in patients with advanced solid tumours
47. Optimal 1-Request Insertion for the Pickup and Delivery Problem with Transfers and Time Horizon
48. Branch-and-Cut-and-Price algorithms for the preemptive RCPSP.
49. No-idle parallel-machine scheduling of unit-time jobs with a small number of distinct release dates and deadlines
50. Pipe-lining dynamic programming processes to synchronize both the production and the consumption of energy
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.