1. MODELS CONCERNING PREVENTIVE VERIFICATION OF TECHNICAL EQUIPMENT
- Author
-
CÂRLAN M., CSUZI. I., and COSTEA M.
- Subjects
share of operating probability ,reliability protection system ,preventive maintenance costs and costs for the corrective option ,ERP and RBM maintenance strategies ,electro-pump ,Environmental sciences ,GE1-350 - Abstract
The paper presents three operative models whose purpose is to improve the practice of preventive maintenance to a wide range of technical installations. Although the calculation criteria are different, the goal is the same: to determine the optimum time between two consecutive preventive interventions. The optimum criteria of these models are: - the maximum share of technical entity operating probabilities, in the case of the Ackoff - Sasieni [1] method; -the optimum time interval for preventive verification depending on the preventive-corrective maintenance costs imposed by the deciding factor, for the AsturioBaldin [2] model; - the minimum number of renewals – preventive and/or corrective maintenance operations [3]
- Published
- 2016