Search

Your search keyword '"Jacquet, D."' showing total 42 results

Search Constraints

Start Over You searched for: Author "Jacquet, D." Remove constraint Author: "Jacquet, D." Topic accelerators and storage rings Remove constraint Topic: accelerators and storage rings
42 results on '"Jacquet, D."'

Search Results

1. Operational tools from 2017 to 2018

2. Abort Gap Keeper and Abort Gap Protection

3. YASP FOR LEIR TO PS INJECTION

4. Breaking the wall between operational and expert tools

5. Injection

6. Abort Gap Cleaning for LHC Run 2

7. LHC Dry-Runs and Machine Check-out

8. Implementation and experience with luminosity levelling with offset beam

9. Collimation quench test with 4 TeV proton beams

10. Software packages: Status and commissioning plans

11. Measurements of Chromatic Coupling in the LHC

12. Study and Operational Implementation of a Tileted Crossing Angle in LHCB

13. First proton-nucleus collisions in the LHC: the p-Pb pilot physics

14. p-Pb Feasibility Test and Modifications of LHC Sequence and Interlocking

15. Beam parameters observations during the second high pile-up collisions fill in 2011

16. Beam based systems and controls

17. The Achromatic Telescopic Squeezing (ATS) MD part III

18. Injection into LHC of bunches at 25 ns spacing

19. Test of luminosity levelling with separated collisions

20. Transverse coupled-bunch instability rise times in the LHC at injection and top energy

21. The Achromatic Telescopic Squeezing (ATS) MD part I

22. Collision tunes at injection and ramp

24. The LHC Injection Tests

25. Ions for LHC: Towards Completion of the Injector Chain

26. Optics Measurements and Matching of TT2-TT10 Line for Injection of the LHC Beam in the SPS

27. Dipole Field, Tune and Chromaticity Correction at the SPS: from Converter Tracking to Eddy Currents

28. SPS Working Point Studies

29. MAD-X PTC Integration

30. LHC Software Architecture: TI8 commissioning

31. Dispersion measurement

32. SPS New Timing Tests

33. Summary of the TT2/TT10 Transfer Line Studies in the Years 2001 and 2002

34. Oasis: A New System to Acquire and Display the Analog Signals for LHC

35. Second Resonance Driving Terms experiment in the SPS at 26 GeV in 2001

36. Resonance Driving Terms experiment in the SPS at 26GeV in 2001

37. Resonance Driving Terms experiments in the SPS at 26GeV during 2000

38. Mesure de l'influence magnétique du cycle proton 450 Gev sur le cycle positron

39. Neutron Multiplicity Measurements in 2 GeV p and $^3$He Induced Reactions on Thin Targets of Heavy Materials

40. The LHC RF system - Experience with beam operation

41. Injection - Issues and potential solutions

42. LHC abort gap cleaning studies during luminosity operation

Catalog

Books, media, physical & digital resources