Back to Search Start Over

SPS New Timing Tests

Authors :
Jacquet, D
Paris, V
Jensen, L
Wehrle, U
Verhagen, H
Partinod, P
Semanaz, P
Jonker, M
Lewis, J
Bau, J C
Bouche, J M
Publication Year :
2004

Abstract

The SPS master timing generator is foreseen to be replaced in 2004 by a central timing generator called CBCM, which will control the whole accelerator complex. At this occasion a working group has been created to review the actual SPS timing events and how it could fit in with the new MTG. It has been decided that a rationalization and simplification of the events was necessary in order that the events are manageable by the CBCM. At the end of the 2003 run, the cleaned-up events have been tested with the SPS MTG. Then the CBCM has been plugged to generate the same events. The tests and their results are described in this document.

Subjects

Subjects :
Accelerators and Storage Rings

Details

Language :
English
Database :
OpenAIRE
Accession number :
edsair.od........65..dd6a7b54ed3c137534f73065db43f337