Search

Your search keyword '"Osama Moselhi"' showing total 101 results

Search Constraints

Start Over You searched for: Author "Osama Moselhi" Remove constraint Author: "Osama Moselhi" Search Limiters Peer Reviewed Remove constraint Search Limiters: Peer Reviewed
101 results on '"Osama Moselhi"'

Search Results

1. The Development of an Automated System for a Quality Evaluation of Engineering BIM Models: A Case Study

2. An Integrated Multi-Criteria Decision Making Model for the Assessment of Public Private Partnerships in Transportation Projects

3. Optimized planning of repair works for pipelines in water distribution networks using genetic algorithm

4. Predicting construction labor productivity using lower upper decomposition radial base function neural network

5. A Fuzzy-Based Decision Support Model for Risk Maturity Evaluation of Construction Organizations

6. Application of Artificial Neural Network(s) in Predicting Formwork Labour Productivity

7. Automated Data Acquisition in Construction with Remote Sensing Technologies

8. Hybrid feature selection framework for predicting bridge deck conditions

9. An integrated RFID–UWB method for indoor localization of materials in construction

10. Conceptual estimation of construction duration and cost of public highway projects

11. A simulation-based statistical method for planning modular construction manufacturing

12. Integrating critical chain project management with last planner system for linear scheduling of modular construction

13. A Grey Wolf Optimization-Based Method for Segmentation and Evaluation of Scaling in Reinforced Concrete Bridges

14. AI-based cloud computing application for smart earthmoving operations

15. Risk quantification using fuzzy-based Monte Carlo simulation

16. A Multi-objective Invasive Weed Optimization Method for Segmentation of Distress Images

17. Optimized material management in construction using multi-layer perceptron

18. An evolutionary stochastic discrete time-cost trade-off method

19. Performance prediction of construction projects using soft computing methods

20. Multi-objective optimization for repetitive scheduling under uncertainty

22. Automated monitoring and assessment of productivity in earthmoving projects

23. Two-tier data fusion method for bridge condition assessment

25. Integration of linear scheduling method and the critical chain project management

26. Near optimum selection of module configuration for efficient modular construction

27. Healthcare facilities maintenance management: a literature review

28. Concrete bridge deck condition assessment using IR Thermography and Ground Penetrating Radar technologies

29. BIM-based model for quantifying the design change time ripple effect

30. Development of an IoT and BIM-based automated alert system for thermal comfort monitoring in buildings

31. Optimized scheduling and buffering of repetitive construction projects under uncertainty

32. Accelerating repetitive construction projects: with uncertainty and contractors’ judgment

33. Inertial measurement unit based indoor localization for construction applications

34. Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory

35. Multi-tier method using infrared photography and GPR to detect and locate water leaks

36. Contingency modelling for construction projects using fuzzy-set theory

37. Enhanced Localization for Indoor Construction

38. Automated condition assessment of concrete bridges with digital imaging

39. Optimized acceleration of repetitive construction projects

40. Image-based retrieval of concrete crack properties for bridge inspection

41. A New Metric for Assessing Resilience of Water Distribution Networks

42. Adaptive Forecasting in Earthmoving Operation Using DES and Site Captured Data

43. Wireless Sensor Networks Configurations for Applications in Construction

44. Project schedule compression: a multi-objective methodology

45. Scheduling Model for Rehabilitation of Distribution Networks Using MINLP

46. MEASURING SENSITIVITY OF PROCUREMENT DECISIONS USING SUPERIORITY AND INFERIORITY RANKING

47. Fuzzy-Based Life-Cycle Cost Model for Decision Making under Subjectivity

48. GPS-less indoor construction location sensing

49. Decision support model for selection of rehabilitation methods of water mains

50. Significance ranking of parameters impacting construction labour productivity

Catalog

Books, media, physical & digital resources