Back to Search Start Over

Scheduling Model for Rehabilitation of Distribution Networks Using MINLP

Authors :
Alaa Salman
Tarek Zayed
Osama Moselhi
Source :
Journal of Construction Engineering and Management. 139:498-509
Publication Year :
2013
Publisher :
American Society of Civil Engineers (ASCE), 2013.

Abstract

Scheduling of the rehabilitation activities of water main networks depends mainly on available budget and planning time. Other factors such as network reliability, criticality, location, contract size, and rehabilitation method(s) affect the optimization of the scheduling process. This paper presents a method for optimized scheduling of rehabilitation work for water distribution networks. The method utilizes unsupervised neural networks (UNNs) and mixed-integer nonlinear programming (MINLP) and performs the scheduling in two stages. In the first stage, UNNs are used to cluster water mains into groups according to locations and rehabilitation methods of water mains. In the second stage, MINLP is used to determine the number of rehabilitation contract packages and the generation of optimized scheduling of these packages considering network reliability, criticality, contract size, and planning time. In order to demonstrate the essential features of the developed method, a case study was analyzed and ...

Details

ISSN :
19437862 and 07339364
Volume :
139
Database :
OpenAIRE
Journal :
Journal of Construction Engineering and Management
Accession number :
edsair.doi...........b330a98ae4d3091caa43240fdc4d686b
Full Text :
https://doi.org/10.1061/(asce)co.1943-7862.0000578