Search

Your search keyword '"Ballesteros-Pérez P"' showing total 44 results

Search Constraints

Start Over You searched for: Author "Ballesteros-Pérez P" Remove constraint Author: "Ballesteros-Pérez P" Search Limiters Available in Library Collection Remove constraint Search Limiters: Available in Library Collection
44 results on '"Ballesteros-Pérez P"'

Search Results

1. Do Projects Really End Late? On the Shortcomings of the Classical Scheduling Techniques

2. Elevated pulse pressure and cardiovascular risk associated in Spanish population attended in primary care: IBERICAN study

3. A new perspective to evaluate the antecedent path of adoption of digital technologies in major projects of construction industry: A case study in China

5. Evaluating the impact of highway construction projects on landscape ecological risks in high altitude plateaus

6. Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management

7. Data-Driven Platform Framework for Digital Whole-Process Expressway Construction Management

8. Application of Spectrometry for Determining the Solar Radiation of Deciduous Trees’ Shade: A Passive Energy Conservation Approach for Mediterranean Climates

9. Determination of Requirements for the Improvement of Occupational Safety in the Cleaning of Vertical Tanks of Petroleum Products

11. Current and Future Trends of Resource Misallocation in the Construction Industry: A Bibliometric Review with Grounded Theory

12. Impact of environmental regulations on carbon emissions of transportation infrastructure: China’s evidence

13. Use of Low-Cost Devices for the Control and Monitoring of CO2 Concentration in Existing Buildings after the COVID Era

14. Do Projects really end late? On the shortcomings of the classical scheduling techniques

15. Dynamic Quality Monitoring System to Assess the Quality of Asphalt Concrete Pavement

16. A new framework to evaluate and optimize digital transformation policies in the construction industry: A China case study

17. The Relationship between Building Agents in the Context of Integrated Project Management: A Prospective Analysis

18. Modeling bidding competitiveness and position performance in multi-attribute construction auctions

19. Integration of Cost and Work Breakdown Structures in the Management of Construction Projects

20. Forecasting the Project Duration Average and Standard Deviation from Deterministic Schedule Information

21. Training Competences in Industrial Risk Prevention with Lego® Serious Play®: A Case Study

22. Factors affecting contractor’s bidding success for international infrastructure projects in australia

23. Mechanical Properties and Seismic Performance of Wood-Concrete Composite Blocks for Building Construction

24. Data-Driven Platform Framework for Digital Whole-Process Expressway Construction Management.

25. Environmental life cycle impact assessment of transportation infrastructure: A multi-case study in international perspective

26. Collusion detection in public procurement auctions with machine learning algorithms

28. Políticas públicas brasileñas para las personas mayores Brazilian public policies for elderly patients

29. Programas e intervenciones de apoyo a los cuidadores informales en España Supporting programs and interventions for informal care providers in Spain

30. Aproximación a un servicio de atención domiciliaria (SAD) municipal Approach to a local home care service

31. Estimating future bidding performance of competitor bidders in capped tenders

32. La construcción del sentido antropológico mexicano en los programas de estudio de la Universidad de Quintana Roo

33. Investigating the role of emissions trading policy to reduce emissions and improve the efficiency of industrial green innovation

34. Facoemulsificación en casos especiales: Instituto Cubano de Oftalmología 'Ramón Pando Ferrer', 2002-2005 Phacoemulsification applied to special cases in 'Ramon Pando Ferrer' Cuban Institute of Ophthalmology, 2002-2005

35. Efficiency of Evolutionary Algorithms in Water Network Pipe Sizing

36. The continuity of hospital nursing care for Primary Health Care in Spain

37. A new perspective to evaluate the antecedent path of adoption of digital technologies in major projects of construction industry: A case study in China

38. Modeling bidding competitiveness and position performance in multi-attribute construction auctions

40. Data-Driven Platform Framework for Digital Whole-Process Expressway Construction Management.

41. Mechanical Properties and Seismic Performance of Wood-Concrete Composite Blocks for Building Construction.

Catalog

Books, media, physical & digital resources