1. Practice of mechanical decoking without stopping the fan in the heating furnace of delayed coking unit.
- Author
-
Wang Xiaoqiang, Yang Youwen, Zhao Yongshan, Lei Xiaochun, and Bao Yingjie
- Subjects
FURNACES ,ODOR control ,FANS (Machinery) ,ENVIRONMENTAL protection ,COAL carbonization ,GAS furnaces ,BLAST furnaces - Abstract
The heating furnace of the 1.20 MM TPY delayed coking unit of PetroChina Dushanzi Petro-chemical Co., Ltd. undergoes mechanical decoking once a year, during which the blower and induced draft fan need to be stopped. The VOCs generated by the deodorization system and odor control facilities can only be directly discharged into the atmosphere, which will cause pollution to the environment. A temporary mobile deodorization system needs to be added, with a cost of about 300,000 yuan. Based on the considerations of environmental protection and improving quality and efficiency, a feasibility analysis and industrial application of the mechanical decoking process scheme for non-stop blowers and induced draft fans were carried out. The results show that by using non-stop blowers and induced draft fans for mechanical coke cleaning, the temperature of the heating furnace tube wall can meet the requirement of not exceeding 100 °C. The maximum mass concentration of NO
x in the flue gas of the heating furnace is 78 mg/m³, which meets the environmental protection requirement of not exceeding 100 mg/m³. The volume fraction of combustible gas at the entrance of the operating furnace chamber is 0.022%, which meets the safety production requirements. The economic benefit of the unit in 6 months was 2.479 million yuan. [ABSTRACT FROM AUTHOR]- Published
- 2024