Search

Your search keyword '"Fast-track construction"' showing total 78 results

Search Constraints

Start Over You searched for: Descriptor "Fast-track construction" Remove constraint Descriptor: "Fast-track construction" Language undetermined Remove constraint Language: undetermined
78 results on '"Fast-track construction"'

Search Results

1. Managing uncertainty in fast-track construction projects: case study from South Africa

2. Characteristics of expanded polystyrene (EPS) and its impact on mechanical and thermal performance of insulated concrete form (ICF) system

3. Comparative analysis on composite construction (structural steel and concrete) and precast concrete construction WRT cost and time

4. Steel concrete composite systems for modular construction of high-rise buildings

5. Innovation & Fast Track Construction

6. 1915 Çanakkale Bridge – Meeting the Challenge

7. Precast Airport Lane Analysis of Military Air Base Using ANSYS

8. Efficiency Measure of Form Work in Construction: A Comparative Assessment

9. Exploring the Quality Management Methods Adopted by Contractors in Fast-Track Construction Projects in Eastern Cape

11. Strength Assessment of Composite Panels Under Dynamic Loading

12. CALCULATION OF THE CONSTRUCTION TIME- SYSTEMATIC MANAGEMENT OF PROJECT UNCERTAINTIES IN RUSH PROJECTS IN MAKKAH

13. Fast Track Construction of Viaducts of Bangalore–Hosur Elevated Expressway

14. An optimization-based model for maximizing the benefits of fast-track construction activities

15. Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects

16. South African Football Stadiums for the 2010 FIFA World Cup

17. Development of the northeast extreme tee (NEXT) beam for accelerated bridge construction

18. A case study of a partially pre-stressed multi-storey building incorporating fast-track construction

19. Induced Stresses from Lifting and Moving Highway Bridges with Self-Propelled Modular Transporters

20. Washington State Department of Transportation Plan for Accelerated Bridge Construction

21. Design–Build Replacement of US-90 Bridge over Bay St. Louis, Mississippi

22. Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea

23. Fast-Track Installation of Micropiles to Resupport Settled Florida SR-60 Bridge End Bents

24. A Near Future

25. Sensitivity of Construction Activities under Design Uncertainty

26. Integrated design management system for mega infrastructure projects: A case study in Korea

27. Cross-organization process integration in design–build team

28. Productivity Aspects of Urban Freeway Rehabilitation with Accelerated Construction

29. State-of-Practice Technologies on Accelerated Urban Highway Rehabilitation: I-15 California Experience

30. Accelerated Practices for Construction of Airfield Concrete Pavement

31. MANAJEMEN RISIKO PADA PROYEK KONSTRUKSI DENGAN METODE FAST TRACK STUDI KASUS PROYEK QUNCI VILLAS DAN PUTRI NAGA KOMODO

32. Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study

33. Accelerating the Construction of a Highway Bridge in Ohio

34. Fast-Track Construction for Concrete Pavement Rehabilitation

35. Integrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction

36. Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis

37. Planning Urban Highway Reconstruction with Traffic Demand Affected by Construction Schedule

38. Comparative Analysis of Travel Impacts between the Design-Build and Traditional Building Methods

39. The reactivation of a landslide during the construction of the Ok Ma tailings dam, Papua New Guinea

40. System dynamics modeling of design and build construction projects

41. Model of Trade-Off between Overlapping and Rework of Design Activities

42. Dynamic Planning for Fast-Tracking Building Construction Projects

43. Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects

44. Precast Concrete Canopy Offers Innovative Design and Fast Track Construction

45. Rapid Bridge Deck Replacement with Full-Depth Precast Concrete Slabs

46. FEATURE: Project Delivery and the U.S. Department of State

47. Concurrent Construction and Life Cycle Project Management

48. Construction of a Metro Line Serving the Holy Sites of Makkah in the Kingdom of Saudi Arabia

49. Consol Energy Center Design and Construction

50. Innovative Design/Build Approach: Ambassador Bridge Project

Catalog

Books, media, physical & digital resources