Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects
- Source :
- Journal of Construction Engineering and Management. 138:716-724
- Publication Year :
- 2012
- Publisher :
- American Society of Civil Engineers (ASCE), 2012.
-
Abstract
- A fast-track project delivery strategy is designed to leverage the ability to execute the design, procurement, and construction phases simultaneously to substantially reduce the overall project duration. The successful execution of the design phase in fast-track projects is especially challenging because the concurrent execution of design and construction interferes with the inherently iterative nature of the design process. In this research, it was hypothesized that a correlation exists between the use of some of the Construction Industry Institute (CII) best practices and the performance of design phase in fast-track projects. Analysis of the performance of the design phase in 31 fast-track projects revealed a statistically significant correlation between performance of the design phase and front-end planning, alignment, constructability, and change management. The results of quantitative analysis are supported by qualitative analysis of data, opinion of experts from industry, and academia. The ...
- Subjects :
- Engineering
Fast-track construction
Integrated project delivery
business.industry
Strategy and Management
Best practice
Building and Construction
Manufacturing engineering
Constructability
Procurement
Industrial relations
Systems engineering
Project management
business
Engineering design process
Civil and Structural Engineering
Design technology
Subjects
Details
- ISSN :
- 19437862 and 07339364
- Volume :
- 138
- Database :
- OpenAIRE
- Journal :
- Journal of Construction Engineering and Management
- Accession number :
- edsair.doi...........7ea19d6ddb27d42498d20eff9e23a7dc
- Full Text :
- https://doi.org/10.1061/(asce)co.1943-7862.0000487