Search

Showing total 78 results
78 results

Search Results

1. The Impact of CO2 Capture on Water Requirements of Power Plants.

2. The Neglected Importance of Corporate Perceptions and Positions for the Long-term Development of CCS.

3. Evaluation of Technology and Policy Issues Associated with the Storage of Carbon Dioxide via Enhanced Oil Recovery in Determining the Potential for Carbon Negative Oil.

4. The Potential for CCUS in Selected Industrial Sectors – Summary of Concept Evaluations in Finland.

5. Modelling and Dynamic Simulation of the 2nd Generation Oxy Fired Power Plant – Oxidant Fan Failure Case.

6. The Australian South West Hub Project: Developing a Storage Project in Unconventional Geology.

7. European Carbon Capture and Storage Project Network: Overview of the Status and Developments.

8. How to “Capture the Future by Utilization of the Past” in the Coming Revision of China CO2 Technology Roadmap?

9. Analysis of the Passive Seismic Monitoring Performance at the Rousse CO2 Storage Demonstration Pilot.

10. The Application of CCS Technology in China: Lesson from the Sino-Italy Collaboration on Coal Fired Power Plants.

11. IMPACTS: Economic Trade-offs for CO2 Impurity Specification.

12. Developments towards environmental regulation of CCUS projects in China.

13. Update on the ROAD Project and Lessons Learnt.

14. Reservoir Characterization from Pressure Monitoring during CO2 Injection into a Depleted Pinnacle Reef – MRCSP Commercial-scale CCS Demonstration Project.

15. The Interdisciplinary Approach of the German Case Study to Enable a Low Carbon Economy by Hydrogen and CCS.

16. Scenario analysis of CO2 emission abatement effect based on LEAP.

17. CarbFix – public engagement and transparency.

18. Comparison of Mass Transfer Models on Rate-Based Simulation of CO2 Absorption and Desorption Processes.

19. Preliminary results of geological characterization and geochemical monitoring of Sulcis Basin (Sardinia), as a potential CCS site.

20. Development of an Index Value of Suitable Layers for CO2 Storage Based on the Attribute Analysis from Conventional Geophysical Loggings.

21. How does Changing the Penetration of Renewables and Flexibility Measures Affect the Economics of CCS Penetration?

22. Societal Responses to CO2 Storage in the UK: Media, Stakeholder and Public Perspectives.

23. Techno-economic Optimization of First Generation Oxy-fired Pulverized-coal Power Plant.

24. Investigation of the Cooling System of a Membrane-based Post-combustion Process.

25. Techno-economic Analysis of MEA CO2 Capture from a Cement Kiln – Impact of Steam Supply Scenario.

26. Developing CCS in the UK and Beyond: Insights from the UK CCS Research Centre.

27. Well Integrity Assessment of Monitoring Wells at an Active CO2-EOR Flood.

28. The Value of CCS under Current Policy Scenarios: NDCs and Beyond.

29. Highlights and Lessons from the EU CCS Demonstration Project Network.

30. Efficient Containment Monitoring with Distributed Acoustic Sensing: Feasibility Studies for the Former Peterhead CCS Project.

31. Process Modelling of the Calcium Looping Process and Validation Against 1 MWth Pilot Testing.

32. Enabling CCS via Low-temperature Geothermal Energy Integration for Fossil-fired Power Generation.

33. The Politics of Large-scale CCS Deployment.

34. Study of Density Driven Convection in a Hele-Shaw Cell with Application to the Carbon Sequestration in Aquifers.

35. The Evolution of European CCS Policy.

36. Preliminary Understanding of CO2 Sequestration and Enhanced Methane Recovery in Raniganj Coalfield of India by Reservoir Simulation.

37. Building Confidence in CO2 Storage Using Reference Datasets from Demonstration Projects.

38. 2.5D Inversion and Joint Interpretation of CSEM Data at Sleipner CO2 Storage.

39. Regionwide Outreach in a Project-level World – Lessons from the PCOR Partnership.

40. Tomakomai CCS Demonstration Project of Japan, CO2 Injection in Process.

41. Operating Flexibility of CO2 Injection Wells in Future Low Carbon Energy System.

42. Assessment of CO2 Levels Prior to Injection Across the Quest Sequestration Lease Area.

43. Optimized, Budget-constrained Monitoring Well Placement Using DREAM.

44. Communicating about the Geological Storage of Carbon Dioxide – Comparing Public Outreach for CO2 EOR and Saline Storage Projects.

45. Overview of World Bank CCUS Program Activities in Mexico.

46. Accelerating Dissolution of CO2 in Brine by Enhancing Convective Mixing as a Potential Remediation Option.

47. Numerical Simulation Study on Mitigation of the Pressure Build-up in the Geological Formation During Injection of CO2.

48. Learnings from CO2CRC Capture Pilot Plant Testing – Assessing Technology Development.

49. Can Carbon Capture and Storage Unlock ‘Unburnable Carbon’?

50. Modelling Supported Development of Oxy-CFB Combustion.