Search

Showing total 159 results

Search Constraints

Start Over You searched for: Topic coal-fired power plants Remove constraint Topic: coal-fired power plants Database Supplemental Index Remove constraint Database: Supplemental Index
159 results

Search Results

1. The potential of fly ash-based calcium silicate as paper filler: Physical properties and printability.

2. Statistical prediction model for water vapor barrier of extrusion-coated paper.

3. Comparative Analysis of Two Fuzzy Modeling Through Investigation of Condensate System.

4. Effects of pulverized coal fly-ash addition as a wet-end filler in papermaking.

5. CONSTRUCTION MATERIALS OBTAINED BY RECYCLING ASH FROM COAL-FIRED POWER PLANTS ASH PONDS. ESTIMATION OF BASIC MECHANICAL PROPERTIES BY MEANS OF MACHINE LEARNING ALGORITHMS. PART II – MACHINE LEARNING ALGORITHMS BENCHMARKING.

6. CONSTRUCTION MATERIALS OBTAINED BY RECYCLING ASH FROM COAL-FIRED POWER PLANTS ASH PONDS. ESTIMATION OF BASIC MECHANICAL PROPERTIES BY MEANS OF MACHINE LEARNING ALGORITHMS. PART I – DISCUSSION ON SUITABILITY OF SEVERAL MACHINE LEARNING...

7. Just transition out of coal-fired power: Policy lessons from Australia's automotive sector closure.

8. The evolutionary analysis of investment in CCS-EOR under dual carbon target—From the perspective of multi-agent involvement.

9. Amine emissions and CO2 purity from carbon capture pilot plant at the Łaziska coal-fired power plant.

10. A Persistent Fossil Fuel Agenda? Japan's Overseas Energy Development in Southeast Asia.

11. Boundary Dam or Petra Nova – Which is a better model for CCS energy supply?

12. China baseline coal-fired power plant with post-combustion CO2 capture: 1. Definitions and performance.

13. Everyday violence: Tigyit coal mine and coal-fired power plant in Shan State, Myanmar.

14. SULPHUR REMOVAL IN COAL-FIRED POWER PLANTS. PART II: BEFORE AND AFTER IMPLEMENTATION.

15. SULPHUR REMOVAL IN COAL-FIRED POWER PLANTS. PART I: SULPHUR EMISSIONS ASSESMENT METHODOOGY.

16. Research on CCUS business model and policy incentives for coal-fired power plants in China.

17. A Critical Review of the Potential for Fly Ash Utilisation in Construction-Specific Applications in India.

18. STUDY ON THE PERSPECTIVES OF COAL BURNING IN CLASSIC THEROELECTRIC POWER PLANTS IN ROMANIA.

19. Techno-economic analysis for the integration of a power to fuel system with a CCS coal power plant.

20. Selecting the approach for dynamic modelling of CO2 capture in biomass/waste fired CHP plants.

21. Carbon-negative emissions: Systemic impacts of biomass conversion: A case study on CO2 capture and storage options.

22. Can CCS save coal fired power plants – The European perspective.

23. Energetic and economic evaluation of membrane-based carbon capture routes for power plant processes.

24. Technology options: Can Chinese power industry reach the CO2 emission peak before 2030?

25. HEAT RECOVERY FOR ELECTRICITY GENERATION IN LOW TEMPERATURE POWER CYCLES.

26. COMPARISON BETWEEN THE PROPERTIES OF BUILDING MATERIALS MANUFACTURED FROM BOTTOM ASH AND FLY ASH PART II. RESULTS AND DISCUSSIONS.

27. COMPARISON BETWEEN THE PROPERTIES OF BUILDING MATERIALS MANUFACTURED FROM BOTTOM ASH AND FLY ASH PART I. MATERIALS AND PROCEDURES.

28. The effect of environmental policy on Chinese firm's green productivity and shadow price: A metafrontier input distance function approach.

29. A sequential approach for the economic evaluation of new CO2 capture technologies for power plants.

30. Flexible operation of coal fired power plant integrated with post combustion CO2 capture using model predictive control.

31. Life cycle optimisation for negative emission technologies in electricity generation.

32. Life Cycle Assessment of a Coal-fired Old Thermal Power Plant.

33. Assessment of the operability of a 20 MWth calcium looping demonstration plant by advanced process modelling.

34. Modeling and sliding mode predictive control of the ultra-supercritical boiler-turbine system with uncertainties and input constraints.

35. Investigating the potential of carbon dioxide utilization in a gas-to-liquids process with iron-based Fischer-Tropsch catalyst.

36. 燃煤电厂锅炉除尘器滤袋失效原因分析.

37. A regional analysis of excess capacity in China’s power systems.

38. Eco-efficiency measurement of coal-fired power plants in China using super efficiency data envelopment analysis.

39. Carbon efficiency and abatement cost of China's coal-fired power plants.

40. Recovery of spent SCR denitration catalyst: A review and recent advances.

41. Long-term environmental stability of bromide coupled mechanical modified fly ash after mercury adsorption.

42. Economic analysis of amine based carbon dioxide capture system with bi-pressure stripper in supercritical coal-fired power plant.

43. Multicriterial analysis of post-combustion carbon dioxide capture using alkanolamines.

44. Integrating carbon capture with transportation and storage.

45. Active and integrated management of water resources throughout CO2 capture and sequestration operations.

46. Carbon capture & storage in power generation and wind energy: Flexibility and reliability issues in scenarios for Northwest Europe.

47. Technical and economic opportunities for flexible CO2 capture at Australian black coal fired power plants.

48. Kinetics and mass transfer of carbon dioxide absorption into aqueous ammonia.

49. Locating new coal-fired power plants with Carbon Capture Ready design–A GIS case study of Guangdong province in China.

50. Model-based monitoring and fault diagnosis of fossil power plant process units using Group Method of Data Handling.