Back to Search Start Over

Machine Protection System Upgrade for a new Timing System at ELBE

Authors :
Justus, M.
(0000-0002-8145-5837) Kuntzsch, M.
Schwarz, A.
(0000-0002-8120-6806) Zenker, K.
Oven, Z.
Perusko, L.
Krmpotic, L.
Legat, U.
Rojec, U.
Justus, M.
(0000-0002-8145-5837) Kuntzsch, M.
Schwarz, A.
(0000-0002-8120-6806) Zenker, K.
Oven, Z.
Perusko, L.
Krmpotic, L.
Legat, U.
Rojec, U.
Source :
ICALEPCS 2023, 09.-13.10.2023, Cape Town, South Africa
Publication Year :
2023

Abstract

Running a C.W. electron accelerator as a user facility for more than two decades necessitates upgrades or even complete redesign of subsystems at some point. At ELBE, the outdated timing system needed a replacement due to obsolete components and functional limitations. Starting in 2019, with Cosylab as contractor and using hardware by Micro Research Finland, the new timing system has been developed and tested and is about to become operational. Besides the ability to generate a broader variety of beam patterns from single pulse mode to 26 MHz C.W. beams for the two electron sources, one of the benefits of the new system is improved machine safety. The ELBE control systems is mainly based on PLCs and industrial SCADA tools. This contribution depicts how the timing system implementation to the existing machine entailed extensions and modifications of the ELBE machine protection system, i.e. a new core MPS PLC, and how they are being realized.

Details

Database :
OAIster
Journal :
ICALEPCS 2023, 09.-13.10.2023, Cape Town, South Africa
Notes :
application/pdf, English
Publication Type :
Electronic Resource
Accession number :
edsoai.on1415613093
Document Type :
Electronic Resource