Back to Search
Start Over
Utah Department of Transportation storm water management plan Updes phase II
- Source :
- dbawdev5_lib2
- Publication Year :
- 2010
-
Abstract
- This Storm Water Management Plan is submitted to the State of Utah, Division of Water Quality for the discharge of municipal storm water under Phase II of the Utah Pollutant Discharge Elimination System. This Storm Water Management Plan applies to UDOT storm water conveyance systems in areas designated by the EPA. This Storm Water Management Plan is designed to limit the discharge of pollutants to UDOT’s storm water systems to the maximum extent practicable (MEP). This plan consists of various best management practices (BMP’s) that help to achieve the goals outlined in 40CFR 122.34(b), Section 402(p)(3)(B) of the Federal Clean Water Act and State of Utah Storm Water Regulations (UAC R317-8-3.8).
Details
- Database :
- OAIster
- Journal :
- dbawdev5_lib2
- Notes :
- English
- Publication Type :
- Electronic Resource
- Accession number :
- edsoai.on1411090540
- Document Type :
- Electronic Resource