Back to Search Start Over

Status report of the n_TOF facility after the 2nd CERN long shutdown period

Authors :
Patronis, N.
Mengoni, A.
Goula, S.
Aberle, O.
Alcayne, V.
Altieri, S.
Amaducci, S.
Andrzejewski, J.
Babiano-Suarez, V.
Bacak, M.
Balibrea Correa, J.
Beltrami, C.
Bennett, S.
Bernardes, A. P.
Berthoumieux, E.
Beyer, R.
Boromiza, M.
Bosnar, D.
Caamano, M.
Calvino, F.
Calviani, M.
Cano-Ott, D.
Casanovas, A.
Castelluccio, D. M.
Cerutti, F.
Cescutti, G.
Chasapoglou, S.
Chiaveri, E.
Colombetti, P.
Colonna, N.
Console Camprini, P.
Cortes, G.
Cortes-Giraldo, M. A.
Cosentino, L.
Cristallo, S.
Dellmann, S.
Di Castro, M.
Di Maria, S.
Diakaki, M.
Dietz, M.
Domingo-Pardo, C.
Dressler, R.
Dupont, E.
Duran, I.
Eleme, Z.
Fargier, S.
Fernandez, B.
Fernandez-Dominguez, B.
Finocchiaro, P.
Fiore, S.
Garcia-Infantes, F.
Gawlik-Ramiega, A.
Gervino, G.
Gilardoni, S.
Gonzalez-Romero, E.
Guerrero, C.
Gunsing, F.
Gustavino, C.
Heyse, J.
Hillman, W.
Jenkins, D. G.
Jericha, E.
Junghans, A.
Kadi, Y.
Kaperoni, K.
Kaur, G.
Kimura, A.
Knapova, I.
Kokkoris, M.
Krticka, M.
Kyritsis, N.
Ladarescu, I.
Lederer-Woods, C.
Lerendegui-Marco, J.
Lerner, G.
Manna, A.
Martinez, T.
Masi, A.
Massimi, C.
Mastinu, P.
Mastromarco, M.
Maugeri, E. A.
Mazzone, A.
Mendoza, E.
Michalopoulou, V.
Milazzo, P. M.
Mucciola, R.
Murtas, F.
Musacchio-Gonzalez, E.
Musumarra, A.
Negret, A.
Perez de Rada, A.
Perez-Maroto, P.
Pavon-Rodriguez, J. A.
Pellegriti, M. G.
Perkowski, J.
Petrone, C.
Pirovano, E.
Plaza del Olmo, J.
Pomp, Stephan
Porras, I.
Praena, J.
Quesada, J. M.
Reifarth, R.
Rochman, D.
Romanets, Y.
Rubbia, C.
Sanchez-Caballero, A.
Sabate-Gilarte, M.
Schillebeeckx, P.
Schumann, D.
Sekhar, A.
Smith, A. G.
Sosnin, N. V.
Stamati, M. E.
Sturniolo, A.
Tagliente, G.
Tarifeno-Saldivia, A.
Tarrío, Diego
Torres-Sanchez, P.
Vagena, E.
Valenta, S.
Variale, V.
Vaz, P.
Vecchio, G.
Vescovi, D.
Vlachoudis, V.
Vlastou, R.
Wallner, A.
Woods, P. J.
Zarrella, R.
Zugec, P.
Patronis, N.
Mengoni, A.
Goula, S.
Aberle, O.
Alcayne, V.
Altieri, S.
Amaducci, S.
Andrzejewski, J.
Babiano-Suarez, V.
Bacak, M.
Balibrea Correa, J.
Beltrami, C.
Bennett, S.
Bernardes, A. P.
Berthoumieux, E.
Beyer, R.
Boromiza, M.
Bosnar, D.
Caamano, M.
Calvino, F.
Calviani, M.
Cano-Ott, D.
Casanovas, A.
Castelluccio, D. M.
Cerutti, F.
Cescutti, G.
Chasapoglou, S.
Chiaveri, E.
Colombetti, P.
Colonna, N.
Console Camprini, P.
Cortes, G.
Cortes-Giraldo, M. A.
Cosentino, L.
Cristallo, S.
Dellmann, S.
Di Castro, M.
Di Maria, S.
Diakaki, M.
Dietz, M.
Domingo-Pardo, C.
Dressler, R.
Dupont, E.
Duran, I.
Eleme, Z.
Fargier, S.
Fernandez, B.
Fernandez-Dominguez, B.
Finocchiaro, P.
Fiore, S.
Garcia-Infantes, F.
Gawlik-Ramiega, A.
Gervino, G.
Gilardoni, S.
Gonzalez-Romero, E.
Guerrero, C.
Gunsing, F.
Gustavino, C.
Heyse, J.
Hillman, W.
Jenkins, D. G.
Jericha, E.
Junghans, A.
Kadi, Y.
Kaperoni, K.
Kaur, G.
Kimura, A.
Knapova, I.
Kokkoris, M.
Krticka, M.
Kyritsis, N.
Ladarescu, I.
Lederer-Woods, C.
Lerendegui-Marco, J.
Lerner, G.
Manna, A.
Martinez, T.
Masi, A.
Massimi, C.
Mastinu, P.
Mastromarco, M.
Maugeri, E. A.
Mazzone, A.
Mendoza, E.
Michalopoulou, V.
Milazzo, P. M.
Mucciola, R.
Murtas, F.
Musacchio-Gonzalez, E.
Musumarra, A.
Negret, A.
Perez de Rada, A.
Perez-Maroto, P.
Pavon-Rodriguez, J. A.
Pellegriti, M. G.
Perkowski, J.
Petrone, C.
Pirovano, E.
Plaza del Olmo, J.
Pomp, Stephan
Porras, I.
Praena, J.
Quesada, J. M.
Reifarth, R.
Rochman, D.
Romanets, Y.
Rubbia, C.
Sanchez-Caballero, A.
Sabate-Gilarte, M.
Schillebeeckx, P.
Schumann, D.
Sekhar, A.
Smith, A. G.
Sosnin, N. V.
Stamati, M. E.
Sturniolo, A.
Tagliente, G.
Tarifeno-Saldivia, A.
Tarrío, Diego
Torres-Sanchez, P.
Vagena, E.
Valenta, S.
Variale, V.
Vaz, P.
Vecchio, G.
Vescovi, D.
Vlachoudis, V.
Vlastou, R.
Wallner, A.
Woods, P. J.
Zarrella, R.
Zugec, P.
Publication Year :
2023

Abstract

During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n_TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported.

Details

Database :
OAIster
Notes :
application/pdf, English
Publication Type :
Electronic Resource
Accession number :
edsoai.on1400059362
Document Type :
Electronic Resource
Full Text :
https://doi.org/10.1140.epjti.s40485-023-00100-w