A longitudinal study on logistics strategy : The case of a building contractor
- Publication Year :
- 2023
-
Abstract
- Purpose Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics strategy from a process of establishing fit perspective. Design/methodology/approach A large Swedish building contractor's logistics strategy process was analysed using a longitudinal single-case study for a period of 11 years (2008–2019). Findings The case study reveals three main constraints to logistics strategy implementation: a dominant purchasing organisation, a lack of incentives and diverging top-management priorities. This suggests that logistics strategy fit is not a conscious choice determined by contextual factors. Research limitations/implications Establishing fit is a continuous cycle of regaining fit between the logistics context and logistics strategy components. Fit can be achieved by a change to the logistics context or to logistics strategy components. Practical implications Logistics managers may need to opt for satisfactory fit in view of the costs incurred by changing strategy versus the benefits to be gained from a higher degree of fit. Originality/value This paper adopts a longitudinal case design to study the fit between the logistics context and strategy, adding to the body of knowledge on organisational design and strategy in logistics and supply chain management.<br />Funding: Development Fund of the Swedish Construction Industry (SBUF); Lars Erik Lundberg Foundation for Research and Education; [13843]
Details
- Database :
- OAIster
- Notes :
- application/pdf, English
- Publication Type :
- Electronic Resource
- Accession number :
- edsoai.on1372245614
- Document Type :
- Electronic Resource
- Full Text :
- https://doi.org/10.1108.ijlm-02-2022-0060