Back to Search Start Over

Minimizing Makespan in a No-Wait Flow Shop With Batch Processing Machines

Authors :
Universidad EAFIT. Departamento de Ingeniería de Producción
Gestión de Producción y Logística
Muthuswamy
Shanthi
Mario C. Vélez-Gallego
Maya
Jairo
Rojas-Santiago
Miguel
Universidad EAFIT. Departamento de Ingeniería de Producción
Gestión de Producción y Logística
Muthuswamy
Shanthi
Mario C. Vélez-Gallego
Maya
Jairo
Rojas-Santiago
Miguel
Source :
61st Annual IIE Conference and Expo Proceedings
Publication Year :
2021

Abstract

Given a set of jobs and two batch processing machines (BPMs) arranged in a flow shop environment<br />the objective is to batch the jobs and sequence the batches such that the makespan is minimized.

Details

Database :
OAIster
Journal :
61st Annual IIE Conference and Expo Proceedings
Notes :
English
Publication Type :
Electronic Resource
Accession number :
edsoai.on1258077586
Document Type :
Electronic Resource