Back to Search Start Over

Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix C: Economic Analysis

Authors :
CORPS OF ENGINEERS WALLA WALLA WA WALLA WALLA DISTRICT
CORPS OF ENGINEERS WALLA WALLA WA WALLA WALLA DISTRICT
Source :
DTIC AND NTIS
Publication Year :
2002

Abstract

This final Dredged Material Management Plan/Enviornmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for managment of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: ALternative 1 = No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).<br />The original document contains color images. All DTIC reproductions will be in black and white.

Details

Database :
OAIster
Journal :
DTIC AND NTIS
Notes :
text/html, English
Publication Type :
Electronic Resource
Accession number :
edsoai.ocn834247551
Document Type :
Electronic Resource