Back to Search Start Over

Self-scheduling of a hydro producer in a pool-based electricity market

Authors :
Conejo, Antonio J.
Arroyo, Jose Manuel
Contreras, Javier
Villamor, Francisco Apolinar
Source :
IEEE Transactions on Power Systems. Nov, 2002, Vol. 17 Issue 4, p1265, 8 p.
Publication Year :
2002

Abstract

This paper addresses the self-scheduling of a hydro generating company in a pool-based electricity market. This company comprises several cascaded plants along a river basin. The objective is to maximize the profit of the company from selling energy in the day-ahead market. This paper proposes a 0/1 mixed-integer linear programming model to account, in every plant, for the nonlinear and nonconcave three-dimensional (3-D) relationship between the power produced, the water discharged, and the head of the associated reservoir. Additionally, start-up costs due mainly to the wear and tear are considered. Finally, different realistic case studies are analyzed in detail. Index Terms--Hydroelectric producer, mixed-integer LP, pool-based electricity market.

Details

ISSN :
08858950
Volume :
17
Issue :
4
Database :
Gale General OneFile
Journal :
IEEE Transactions on Power Systems
Publication Type :
Academic Journal
Accession number :
edsgcl.96238434