Back to Search Start Over

Multi-Period Probabilistic Production Cost Model Including Dispatch Constraints

Authors :
Perez-Ruiz, Juan
Conejo, Antonio J.
Source :
IEEE Transactions on Power Systems. May, 2000, Vol. 15 Issue 2, 502
Publication Year :
2000

Abstract

This paper presents a multi-period probabilistic production cost model. Dispatch intra-period and inter-period constraints are considered through the use of a facet LP formulation. An efficient solution procedure based on the Dantzig--Wolfe decomposition technique is developed. The work reported in this paper extends previous work in two respects: (i) inter-period constraints are rigurously treated, and (ii) a systematic general solution procedure is developed. Results for a large-scale case study are presented. Index Terms--Multi-period probabilistic production costing, dispatch constraints, facet LP, Dantzig--Wolfe decomposition.

Details

ISSN :
08858950
Volume :
15
Issue :
2
Database :
Gale General OneFile
Journal :
IEEE Transactions on Power Systems
Publication Type :
Academic Journal
Accession number :
edsgcl.65913791