Back to Search Start Over

Underground long-term mine production scheduling with integrated geological risk management

Authors :
Carpentier, S.
Gamache, M.
Dimitrakopoulos, R.
Source :
South Africa Mining. September 11, 2015, p11, 1 p.
Publication Year :
2015

Abstract

A stochastic integer programming (SIP) model is presented to optimise long-term scheduling of underground mine operations while considering geological uncertainty. To integrate this uncertainty, a set of stochastic simulations is generated, corresponding to representations of the deposit, and is used as primary inputs to optimisation. The two-stage SIP model developed considers a variable cut-off grade and accounts for maximum development, material handling flow conservation, mill and mine capacity, and activity precedencies for an underground nickel mine. The results show that the schedule generated has a higher expected value when considering and managing grade risk. They also demonstrate the benefits of risk control, which this approach allows.<br />http://www.maneyonline.com/doi/abs/10.1179/1743286315Y.0000000026

Details

Language :
English
Database :
Gale General OneFile
Journal :
South Africa Mining
Publication Type :
News
Accession number :
edsgcl.429279408