Back to Search
Start Over
The testability tune-up
- Source :
- America's Network. August 1, 1997, Vol. 101 Issue 15, p27, 5 p.
- Publication Year :
- 1997
-
Abstract
- The introduction of digital loop carriers (DLC) has made testability levels more complex. A six-step tune-up procedure for UDLC based systems is described. The first step is verifying the operation of the pair gain test controller. The second is surveying DLC systems. The third involves verifying test system availability. The fourth is examining metallic test access to customer lines. The fifth is assessing the accuracy of the line record database. The last involves updating the training of DLC test personnel.<br />This six-step process could resolve your test system and dispatching problems Testing POTS lines and assuring the accuracy of the tests used to be much easier. When a line test [...]
Details
- ISSN :
- 10755292
- Volume :
- 101
- Issue :
- 15
- Database :
- Gale General OneFile
- Journal :
- America's Network
- Publication Type :
- Periodical
- Accession number :
- edsgcl.19766724