Back to Search Start Over

Unit commitment with probabilistic spinning reserve and interruptible load considerations

Authors :
Aminifar, Farrokh
Fotuhi-Firuzabad, Mahmud
Shahidehpour, Mohammad
Source :
IEEE Transactions on Power Systems. Feb, 2009, Vol. 24 Issue 1, p388, 10 p.
Publication Year :
2009

Abstract

This paper demonstrates how a probabilistic criterion could be explicitly integrated in the unit commitment (UC) formulation. Both spinning reserve and interruptible load are taken into account as the operating reserve facilities. Incorporating the interruption notice time of interruptible load involves some complexities in the evaluation procedure and problem formulation which is considered in this paper. The expected energy not supplied (EENS) is considered as a probabilistic criterion and a new method is proposed to calculate this index in the presence of interruptible load. The reliability-constrained unit commitment (RCUC) problem is formulated based on the mixed-integer programming (MIP) method that can be solved using large-scale commercial solvers. The effectiveness of the proposed formulation is examined using the IEEE-RTS. Numerical results are presented and the implementation issues are discussed. A number of analyses are examined to evaluate the impact of some important factors on the problem solution. Index Terms--Interruptible load, mixed-integer programming (MIP), reliability-constrained unit commitment (RCUC), spinning reserve.

Details

Language :
English
ISSN :
08858950
Volume :
24
Issue :
1
Database :
Gale General OneFile
Journal :
IEEE Transactions on Power Systems
Publication Type :
Academic Journal
Accession number :
edsgcl.193406653