Back to Search
Start Over
Construction and test of 3.6 m [Nb.sub.3]Sn racetrack coils for LARP
- Source :
- IEEE Transactions on Applied Superconductivity. June, 2008, Vol. 18 Issue 2, p171, 4 p.
- Publication Year :
- 2008
-
Abstract
- The construction of the first long [Nb.sub.3]Sn magnet with racetrack coils 3.6 m long for the LHC Accelerator Research Program (LARP) is described. The magnet has reached a nominal plateau at 9596 A after five quenches, which is about 90% of the estimated conductor limit.
Details
- Language :
- English
- ISSN :
- 10518223
- Volume :
- 18
- Issue :
- 2
- Database :
- Gale General OneFile
- Journal :
- IEEE Transactions on Applied Superconductivity
- Publication Type :
- Academic Journal
- Accession number :
- edsgcl.181440860