Back to Search Start Over

Motown tunneling

Authors :
Tarricone, Paul
Source :
Civil Engineering. April, 1992, Vol. 62 Issue 4, p60, 2 p.
Publication Year :
1992

Abstract

Tunneling operations for the North Huron/Rouge Valley Wastewater Control project in Wayne County, MI, revealed a range of soil conditions that will make progress difficult. The project's contractor, joint venture Kajima/C.J. Rogers, adopted a method that combined an automated tunnel-boring machine (TBM) with a manual TBM for the pipe-laying process. The wastewater facility is the first phase of a three-part sewer project for Wayne County, MI, and will connect far-flung areas like Dearborn to Detroit's sewage facilities.

Details

ISSN :
08857024
Volume :
62
Issue :
4
Database :
Gale General OneFile
Journal :
Civil Engineering
Publication Type :
Academic Journal
Accession number :
edsgcl.12254732