Back to Search Start Over

Optimal operation of cascade hydropower station based on interior point method

Authors :
Shuai Feng
Yun Zhu
Source :
Energy Reports, Vol 8, Iss , Pp 866-873 (2022)
Publication Year :
2022
Publisher :
Elsevier, 2022.

Abstract

The optimal operation of cascade hydropower station is a hydropower system based on the optimal operation method of a single reservoir and considering the water relations between reservoirs. Based on the allocation capacity of the reservoir, Water resources are redistributed in cascade basins, so that the power generation can reach the maximum under the condition of limited water resources. The optimal operation of cascade hydropower stations is a nonlinear optimization problem with many variables and constraints. When solving nonlinear problems, this paper considers using interior point method, which has good robustness characteristics. In this paper, interior point method is used to solve the optimal operation of cascade hydropower stations with intermountain runoff flows into the reservoir. The method used in this paper can shorten the optimal operation calculation time of 24 h 4 reservoir cascade hydropower station to 0.16 s. Compared with the traditional manual operation calculation, the calculation in this paper can be used for online operation to realize real-time operation. The manually scheduled power generation and the calculated power generation are 4328MW and 4617.77MW. In the calculation result, the power generation is 6.7% more than that of the manual calculation result.

Details

Language :
English
ISSN :
23524847
Volume :
8
Issue :
866-873
Database :
Directory of Open Access Journals
Journal :
Energy Reports
Publication Type :
Academic Journal
Accession number :
edsdoj.bf7b70c1b11e46f7b564f29cbc837d8c
Document Type :
article
Full Text :
https://doi.org/10.1016/j.egyr.2022.02.262