Back to Search Start Over

Steady State Assessment of Shunt Compensated EHV Insulated Cables by Means of Multiconductor Cell Analysis (MCA)

Authors :
Roberto Benato
Source :
Energies, Vol 5, Iss 1, Pp 168-180 (2012)
Publication Year :
2012
Publisher :
MDPI AG, 2012.

Abstract

The author has already presented some papers which allow studying cable systems by means of the multiconductor cell analysis (MCA). This method considers the cable system in its real asymmetry without simplified and approximated hypotheses. The multiconductor matrix procedure based on the use of admittance matrices, which account for the line cells (with earth return currents), different types of screen bonding, possible multiple circuits (single and double circuit or more), allows predicting the steady-state regime of any cable system. In the previous papers, these matrix algorithms have been presented with reference to a short extra-high voltage (EHV) double-circuit cross-bonded (CB) underground cable (UGC) system. Since the cable link was short, the shunt reactive compensation was not necessary and consequently not considered. In this paper the procedure is generalized in order to take into account three single-phase (or also one three-phase) reactors installed at the cable ends or also at intermediate locations.

Details

Language :
English
ISSN :
19961073
Volume :
5
Issue :
1
Database :
Directory of Open Access Journals
Journal :
Energies
Publication Type :
Academic Journal
Accession number :
edsdoj.9d400058be0e4eb08ba1ef9ea5277087
Document Type :
article
Full Text :
https://doi.org/10.3390/en5010168