On the optimization of the construction of ventilation systems during the construction of metro by underground method

Authors :
Vartanov Alexander
Markova Irina
Fedash Anatoly
Source :
MATEC Web of Conferences, Vol 265, p 05028 (2019)
Publication Year :
2019
Publisher :
EDP Sciences, 2019.

Abstract

The article discusses optimal versions for placement of ventilation systems for deep-laid underground lines, performed in a closed way, with the removal of the ventilation chamber from the ventilation output and placing it either in the ventilation shaft or in a specially constructed ventilation chamber located near the trunk, which significantly simplifies the design of excavation, and as a result, speed up its construction. To reduce the construction time, it is proposed to perform parallel work on the vent development and the ventilation chamber, including the possible installation of process equipment in parallel with the mining operations during the construction of the metro by the underground method.

Details

Language :
English, French
ISSN :
2261236X
Volume :
265
Database :
Directory of Open Access Journals
Journal :
MATEC Web of Conferences
Publication Type :
Academic Journal
Accession number :
edsdoj.95c4ecc87b29439baef6ad13393b7f5e
Document Type :
article
Full Text :
https://doi.org/10.1051/matecconf/201926505028