Cite
Short-Term Load Dispatching Method for a Diversion Hydropower Plant with Multiple Turbines in One Tunnel Using a Two-Stage Model
MLA
Shengli Liao, et al. “Short-Term Load Dispatching Method for a Diversion Hydropower Plant with Multiple Turbines in One Tunnel Using a Two-Stage Model.” Energies, vol. 12, no. 8, Apr. 2019, p. 1476. EBSCOhost, https://doi.org/10.3390/en12081476.
APA
Shengli Liao, Hongye Zhao, Gang Li, & Benxi Liu. (2019). Short-Term Load Dispatching Method for a Diversion Hydropower Plant with Multiple Turbines in One Tunnel Using a Two-Stage Model. Energies, 12(8), 1476. https://doi.org/10.3390/en12081476
Chicago
Shengli Liao, Hongye Zhao, Gang Li, and Benxi Liu. 2019. “Short-Term Load Dispatching Method for a Diversion Hydropower Plant with Multiple Turbines in One Tunnel Using a Two-Stage Model.” Energies 12 (8): 1476. doi:10.3390/en12081476.