Budget and cost contingency CART models for power plant projects

Authors :
Md Arifuzzaman
Uneb Gazder
Muhammad Saiful Islam
Martin Skitmore
Source :
Journal of Civil Engineering and Management, Vol 28, Iss 8 (2022)
Publication Year :
2022
Publisher :
Vilnius Gediminas Technical University, 2022.

Abstract

Cost overruns are a ubiquitous feature of construction projects, and realistic budgeting at the development stage plays a significant role in their control. However, the application of existing models to budgeting for power plant projects is restricted by the limited amount of project-specific cost data available. This study overcomes this by using a Classification and Regression Tree (CART) approach involving mixed methods of website visits, document study, and expert opinion to predict the amount of project cost (PC) and cost contingency (CC) needed to cover probable cost increases by the use of models containing readily available project attributes and national economic parameters at the project development stage. The modeling process is demonstrated and tested with a case study involving 58 Bangladeshi power plant projects – producing average absolute errors ranging from 0.7% to 1.7% and enabling project cost, inflation rate, and GDP to be identified as significant factors affecting PC and CC modeling. The approach can be applied to predict the PC during preliminary budgeting and selecting a project type and location aligned to the country’s economic status and policy-making strategies, thus facilitating further investment decisions.

Details

Language :
English
ISSN :
13923730 and 18223605
Volume :
28
Issue :
8
Database :
Directory of Open Access Journals
Journal :
Journal of Civil Engineering and Management
Publication Type :
Academic Journal
Accession number :
edsdoj.81d90394ea4e70bab69d1283172d92
Document Type :
article
Full Text :
https://doi.org/10.3846/jcem.2022.16944