Back to Search Start Over

Maintenance Analysis of Raw Mill Machines in Cement Production

Authors :
Aditya Chandra Nugroho
Taurista Perdana Syawitri
Rafi Miftachul An’am
Source :
Engineering Proceedings, Vol 63, Iss 1, p 5 (2024)
Publication Year :
2024
Publisher :
MDPI AG, 2024.

Abstract

PT X is one of the companies that produces cement in Indonesia. Engine breakdowns do happen occasionally in raw mill machines in PT X. This study analyzed the cause of occasional breakdowns. The CC-2 raw mill machine had an average operational time of 4.8 days per week and a total breakdown time of 137.76 h. Overall equipment effectiveness (OEE) analysis revealed an average OEE of 57%, with the performance rate being the most significant influence. The OEE of the CC-2 raw mill machine is below 65%, which is unacceptable, because it causes significant economic losses and very low company competitiveness. Failure mode and effects analysis (FMEA) identified various causes for breakdowns, such as gas supply failure, wear/fatigue, electrical issues, and raw material quality. Suggestions for solutions are provided, including repairs, replacements, and preventive maintenance.

Details

Language :
English
ISSN :
26734591
Volume :
63
Issue :
1
Database :
Directory of Open Access Journals
Journal :
Engineering Proceedings
Publication Type :
Academic Journal
Accession number :
edsdoj.4ae521f586f945db8aa0de0bf487f5ad
Document Type :
article
Full Text :
https://doi.org/10.3390/engproc2024063005