Back to Search Start Over

Developing a fuzzy bi-objective programming and MCDM model for bridge maintenance strategy optimization

Authors :
Fereydoon Shojaei
Heidar Dashti Naserabadi
Mohammad Javad Taheri Amiri
Source :
Scientific Reports, Vol 14, Iss 1, Pp 1-21 (2024)
Publication Year :
2024
Publisher :
Nature Portfolio, 2024.

Abstract

Abstract Bridges serve as critical links in road networks, requiring continuous maintenance to ensure proper functionality throughout their lifespan. Given their pivotal role in the urban landscape, connecting various parts of a city, this research presents a multi-objective optimization model for the maintenance and repair of bridges in Babolsar, Iran. The model takes into account budget constraints and aims to minimize the total life cycle and user costs, encompassing traffic delays and vehicle expenses, while maximizing the reliability of the bridge network. Recognizing the inherent complexity of this problem, a multi-objective particle swarm optimization algorithm has been developed for an accurate solution. The study further conducts sensitivity analysis on the objective function concerning the available budget, evaluating key parameters such as hourly costs and the time value of vehicles. The results show that with an increase in the budget level, the number of repairs related to the most costly maintenance has significantly risen. In other words, as the budget expands, the model tends to favor repairs with higher costs because their impact on the bridge’s performance is more substantial.

Details

Language :
English
ISSN :
20452322
Volume :
14
Issue :
1
Database :
Directory of Open Access Journals
Journal :
Scientific Reports
Publication Type :
Academic Journal
Accession number :
edsdoj.3ed63b127f5947a0ad7cd0164e6a4a52
Document Type :
article
Full Text :
https://doi.org/10.1038/s41598-024-58058-y