Back to Search Start Over

Commercial building flooring failure caused by swelling of the foundation layers

Authors :
Kwiecień Sławomir
Source :
MATEC Web of Conferences, Vol 284, p 04003 (2019)
Publication Year :
2019
Publisher :
EDP Sciences, 2019.

Abstract

The work describes the damage, testing and method of repairing the flooring. The flooring formed part of a commercial pavilion covering an area of approx. 1200 m2. Significant damage in the form of cracks and elevations of up to a height of almost 80 mm were detected in the flooring. Geodetic, laboratory and geotechnical tests were carried out to determine the causes of the damage. The cause was found to be swelling of the floor base course layers, consisting of embankments made of unburnt colliery shale mixed with ashes. The swelling processes ceased about 5 years after the structure was commissioned.

Details

Language :
English, French
ISSN :
2261236X
Volume :
284
Database :
Directory of Open Access Journals
Journal :
MATEC Web of Conferences
Publication Type :
Academic Journal
Accession number :
edsdoj.3afd1bee70c9488ba7a97ffbdcac1e86
Document Type :
article
Full Text :
https://doi.org/10.1051/matecconf/201928404003