Interval Estimate of Project Time Completion Using Simulation Approach

Authors :
Amin Zeinalzadeh
Jafar Hosseini Dolama
Majid Bagerzadeh Khajeh
Source :
مدیریت بهره وری, Vol 4, Iss 2 (13) تابستان, Pp 141-162 (2010)
Publication Year :
2010
Publisher :
Islamic Azad University, Tabriz Branch, 2010.

Abstract

This paper aims to utilize an approach for computing time completion of project network paths with determined activities that can be used to estimate the time completion of a project. Activity durations are considered to be deterministic in critical path method (CPM). Since it is impossible to predict future events in a deterministic manner, project evaluation and review technique (PERT) is introduced which studies project with probabilistic activity durations. In this technique, large variance of path durations can influence the calculation accuracy, in which case the simulation technique is an appropriate method. In this paper, a sample arrow network is chosen, and a time distribution is fitted for each activity with Input Analyzer Software using some historical data. Mean square error, chi-square and Kolmogorov-Smirnov (K-S) tests are used as three measures to evaluate the goodness-of-fit. In the next stage, a computer model is built for the network in Arena 7.0 software. This model is run 120 times and based on these replications, the minimum required sample size for (1-α) Í100% confidence interval is specified. Finally, a confidence interval is computed for duration of each network path and based on this; the time completion of project is estimated.

Details

Language :
Persian
ISSN :
27169979 and 24767298
Volume :
4
Issue :
2 (13) تابستان
Database :
Directory of Open Access Journals
Journal :
مدیریت بهره وری
Publication Type :
Academic Journal
Accession number :
edsdoj.32eedb8038aa4f669963a6a7e3887946
Document Type :
article