Back to Search Start Over

PENJADWALAN FLOWSHOP MENGGUNAKAN ALGORITMA NAWAZ ENSCORE HAM

Authors :
Ilyas Masudin
Dana Marsetya Utama
Febrianto Susastro
Source :
Jurnal Ilmiah Teknik Industri, Vol 13, Iss 1, Pp 54-59 (2014)
Publication Year :
2014
Publisher :
Muhammadiyah University Press, 2014.

Abstract

This article attempts to schedule flow shop production using Nawaz Enscore Ham (NEH) to schedule jobs machining. The objective of this paper is to minimize total makespan which could reduce total production costs. This paper is based on the case study where NEH is applied in scheduling jobs in machines and then compared with the existing machine’s scheduling. The algorithm of NEH is also used to reduce idle time of machines so that the utility or performances of the machine are maintained. The results of NEH simulation indicate that by applying NEH algorithm to scheduling machines for 10 jobs and 5 machines can reduce 2.5 per cent or 118 minutes of completing time of jobs. It also decreases total idle time of machines about 582 minutes compared with the existing scheduling.

Details

Language :
English, Indonesian
ISSN :
14126869, 24604038, and 80188222
Volume :
13
Issue :
1
Database :
Directory of Open Access Journals
Journal :
Jurnal Ilmiah Teknik Industri
Publication Type :
Academic Journal
Accession number :
edsdoj.22295a2d47914a7e80188222e30851b3
Document Type :
article
Full Text :
https://doi.org/10.23917/jiti.v13i1.321