Back to Search Start Over

Research on an Evaluation Method for the Adaptability of TBM Tunnelling

Authors :
Zhongsheng Tan
Zonglin Li
Zhenliang Zhou
Haixiang Lai
Yifeng Jiao
Fengyuan Li
Liming Wang
Source :
Applied Sciences, Vol 12, Iss 9, p 4590 (2022)
Publication Year :
2022
Publisher :
MDPI AG, 2022.

Abstract

When a TBM carries out tunnelling in complex strata, there is often low tunnelling efficiency and an increase in tunnelling costs due to the improper selection of tunnelling parameters, the wrong estimation of geological conditions, or adverse geology, so it is necessary to evaluate the tunnelling adaptability of TBM construction. In this paper, based on hydraulic engineering in Xinjiang, 11 evaluation indexes of TBM tunnelling adaptability are determined by comprehensively considering the influence of tunnelling parameters, geological conditions, and adverse geological factors on TBM tunnelling adaptability. After that, the membership function of each evaluation index is determined by referring to the existing research results and fuzzy mathematics method, and the weight of each evaluation index is determined and adjusted by the analytic hierarchy process (AHP)–entropy weight (EW) method. Finally, the adaptability evaluation method and evaluation model of TBM tunnelling are put forward. The TBM tunnelling adaptability evaluation model proposed in this paper is verified by relying on the actual situation of three interval tunnels in the project, and good effects are obtained. This study can provide a reference for the evaluation of TBM tunnelling adaptability in similar strata.

Details

Language :
English
ISSN :
20763417
Volume :
12
Issue :
9
Database :
Directory of Open Access Journals
Journal :
Applied Sciences
Publication Type :
Academic Journal
Accession number :
edsdoj.1788e81e725b40df8b28f501422b899a
Document Type :
article
Full Text :
https://doi.org/10.3390/app12094590