Back to Search Start Over

The posibility analysis of high-pressure drilling in Block A in Field F

Authors :
Zhou Wenming
Source :
E3S Web of Conferences, Vol 352, p 01009 (2022)
Publication Year :
2022
Publisher :
EDP Sciences, 2022.

Abstract

The drilling and shut-in regulations for peripheral oil fields currently follow the standard of the old area of placanticline, i.e., the wellhead pressure of water injection wells within 600m of the drilling well is reduced to below 3MPa before drilling. The regulations did not take into account the depth of the target formation, structural development, reservoir properties and oil and water well connectivity in the peripheral oilfield, which made it difficult to relieve pressure in most of the wells and resulted in longer drilling and shut-in cycles and greater impact on production. In order to minimize the impact of drilling and shut-in on field development and to explore drilling and shut-in limits and standards suitable for peripheral fields, drilling tests were conducted in Block A for infill wells. The feasibility of high pressure drilling in the peripheral low permeability oilfield was analyzed by analyzing the drilling site conditions, the quality of post-completion cementing and the logging data of the completed wells under different pressure conditions.

Details

Language :
English, French
ISSN :
22671242
Volume :
352
Database :
Directory of Open Access Journals
Journal :
E3S Web of Conferences
Publication Type :
Academic Journal
Accession number :
edsdoj.15b3df9247374c60a24fb4ccb545d16f
Document Type :
article
Full Text :
https://doi.org/10.1051/e3sconf/202235201009