Cite
Robust prequalification process of a distribution system operator considering N‐1 contingency
MLA
Chang Min Jeong, et al. “Robust Prequalification Process of a Distribution System Operator Considering N‐1 Contingency.” IET Renewable Power Generation, vol. 16, no. 12, Sept. 2022, pp. 2694–710. EBSCOhost, https://doi.org/10.1049/rpg2.12483.
APA
Chang Min Jeong, Seung Wan Kim, Jung Sung Park, Yong Tae Yoon, & Hee Seung Moon. (2022). Robust prequalification process of a distribution system operator considering N‐1 contingency. IET Renewable Power Generation, 16(12), 2694–2710. https://doi.org/10.1049/rpg2.12483
Chicago
Chang Min Jeong, Seung Wan Kim, Jung Sung Park, Yong Tae Yoon, and Hee Seung Moon. 2022. “Robust Prequalification Process of a Distribution System Operator Considering N‐1 Contingency.” IET Renewable Power Generation 16 (12): 2694–2710. doi:10.1049/rpg2.12483.