Back to Search Start Over

Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab

Authors :
Helsper, J.
Chandrasekaran, S.
Holzbauer, J.
Solyak, N.
Publication Year :
2023

Abstract

The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which will see stresses during an excitation event. Since the antenna design is new, and because of the setback failure would create, a cyclic stress test was devised for the antenna. This paper presents the experimental methods, setup, and results of the test.

Subjects

Subjects :
Physics - Accelerator Physics

Details

Database :
arXiv
Publication Type :
Report
Accession number :
edsarx.2307.05778
Document Type :
Working Paper