Cite
Resource-constrained multi-project scheduling with activity and time flexibility
MLA
Hauder, Viktoria A., et al. Resource-Constrained Multi-Project Scheduling with Activity and Time Flexibility. 2019. EBSCOhost, https://doi.org/10.1016/j.cie.2020.106857.
APA
Hauder, V. A., Beham, A., Raggl, S., Parragh, S. N., & Affenzeller, M. (2019). Resource-constrained multi-project scheduling with activity and time flexibility. https://doi.org/10.1016/j.cie.2020.106857
Chicago
Hauder, Viktoria A., Andreas Beham, Sebastian Raggl, Sophie N. Parragh, and Michael Affenzeller. 2019. “Resource-Constrained Multi-Project Scheduling with Activity and Time Flexibility.” doi:10.1016/j.cie.2020.106857.