Observational Study of Contracts Processing at 29 CTSA Sites

Authors :
Kiriakis, James
Gaich, Nicholas
Johnston, S. Claiborne
Kitterman, Darlene
Rosenblum, Daniel
Salberg, Libby
Rifkind, Adam
Publication Year :
2013
Publisher :
John Wiley and Sons Inc., 2013.

Abstract

We measured contracts final negotiation (FN) and full execution (FE) times using shared definitions in a prospective observational study of management of contracts for clinical trials at 29 CTSA institutions. Median FN and FE times were reached in 39 and 91 days, respectively; mean times for FN and FE were 55 and 103 days, respectively. Individual site medians ranged from 3 to 116 days for FN and 34 to 197 days for FE. The use of master agreements (MAs) and previously negotiated terms (PNTs) was associated with significant reduction of FN times by a mean of 33 days (p < 0) and 22 days (p < 0.001), respectively. PNTs, but not MAs, were associated with significantly reduced FE time (22 days, p < 0.007). Gap analysis revealed a gap of 22 days between contracts negotiation and Institutional Review Board (IRB) review and intervals of 33 days (contracts) and 48 days (IRB review) during which the process steps were being conducted alone, suggesting a potential benefit with parallel processing. These baseline data support a plan to investigate root causes of prolonged study startā€up time by examining causes of variation and outliers.

Details

Language :
English
Database :
OpenAIRE
Accession number :
edsair.pmid..........b07763a3919e98291118f419a00aab9c