Back to Search
Start Over
ATF2 Commissioning
- Source :
- Proceedings of the 23rd Particle Accelerator Conference, 23rd Particle Accelerator Conference "PAC09", 23rd Particle Accelerator Conference "PAC09", May 2009, Vancouver, Canada. pp.FR1RAI03
- Publication Year :
- 2009
- Publisher :
- HAL CCSD, 2009.
-
Abstract
- International audience; ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.
- Subjects :
- [PHYS.HPHE]Physics [physics]/High Energy Physics - Phenomenology [hep-ph]
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Journal :
- Proceedings of the 23rd Particle Accelerator Conference, 23rd Particle Accelerator Conference "PAC09", 23rd Particle Accelerator Conference "PAC09", May 2009, Vancouver, Canada. pp.FR1RAI03
- Accession number :
- edsair.od......2592..765bce01392712d0b4dd87b3e498f51b