Cite
Erratum [Resampling a Time-Series Process: A Method of Estimating the Probabilities Associated with Alternative Plans for Protecting Pensions against Inflation]
MLA
Denton, F. T., and B. G. Spencer. “Erratum [Resampling a Time-Series Process: A Method of Estimating the Probabilities Associated with Alternative Plans for Protecting Pensions against Inflation].” Journal of Applied Econometrics, vol. 7, no. 2, Jan. 1992, pp. 211–13. EBSCOhost, widgets.ebscohost.com/prod/customlink/proxify/proxify.php?count=1&encode=0&proxy=&find_1=&replace_1=&target=https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&scope=site&db=edsair&AN=edsair.od.......645..5d16d3ee3ca0a9d49bd3657d306cb79a&authtype=sso&custid=ns315887.
APA
Denton, F. T., & Spencer, B. G. (1992). Erratum [Resampling a Time-Series Process: A Method of Estimating the Probabilities Associated with Alternative Plans for Protecting Pensions against Inflation]. Journal of Applied Econometrics, 7(2), 211–213.
Chicago
Denton, F T, and B G Spencer. 1992. “Erratum [Resampling a Time-Series Process: A Method of Estimating the Probabilities Associated with Alternative Plans for Protecting Pensions against Inflation].” Journal of Applied Econometrics 7 (2): 211–13. http://widgets.ebscohost.com/prod/customlink/proxify/proxify.php?count=1&encode=0&proxy=&find_1=&replace_1=&target=https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&scope=site&db=edsair&AN=edsair.od.......645..5d16d3ee3ca0a9d49bd3657d306cb79a&authtype=sso&custid=ns315887.