Back to Search
Start Over
Optimization of 6He production using W or Ta converter surrounded by BeO target assembly
-
Abstract
- Optimization of the converter-BeO 2 step target for 6He production done on MCNPX. x5 gain factor is obtained for a final production of 1.1e14 6He/s with an incident 200kW, 2 GeV proton beam. Temperature profiles and BeO release properties are yet to be determined.
- Subjects :
- TASK 3 [3]
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Accession number :
- edsair.od........65..d919d9423aae4017641ac77675e805a9