Back to Search
Start Over
Underwater sound emissions and effects of the pile driving of the OWEZ windfarm facility near Egmond aan Zee (Tconstruct)
- Publication Year :
- 2007
-
Abstract
- The aim of this part of the Monitoring and Evaluation Program NSW (MEP-NSW), i.e. “acoustic measurements”, is to measure and analyze underwater sound emissions from the construction of the OWEZ wind farm and to investigate the effects to marine animals (in particular fish, harbour porpoises and seals) from other relevant studies. The Off-Shore Wind farm Egmond aan Zee (OWEZ) was built in the Dutch coastal zone 8 - 18 km off the coast from Egmond aan Zee. It consists of an arrangement of 36 wind turbines with a total capacity of 108 MW.
- Subjects :
- construction
windmolens
constructie
offshore
noordzee
noise pollution
windmills
netherlands
geluidsproductie
environmental impact
nederland
piles
sound production
civiele techniek
geluidshinder
akoestische emissie
pijlers
milieueffect
wind power
windenergie
Wageningen Marine Research
underwater acoustics
north sea
onderwaterakoestiek
civil engineering
acoustic emissions
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Accession number :
- edsair.dris...00893..d380a77014dc3fd24ace1117f5971db7